GAA 2024 SSP24AE0102

SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - CONSTRUCTION OF SLOPE PROTECTION STRUCTURE - CONSTRUCTION OF SLOPE PROTECTION, BARANGAY BUGBUGCAO -BARANGAY PACPACAC, STA. 1+331.60 - STA. 1+980, SAN JUAN, LA UNION

SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - CONSTRUCTION OF SLOPE PROTECTION STRUCTURE - CONSTRUCTION OF SLOPE PROTECTION, BARANGAY BUGBUGCAO -BARANGAY PACPACAC, STA. 1+331.60 - STA. 1+980, SAN JUAN, LA UNION is a DPWH-tracked public work in La Union 1st DEO, Region I. Reported contract value: ₱144,747,995.50. Status: Past target date (DPWH On-Going). Contractor on record: ANORE CONST. Figures trace to dpwh.

La Union 1st DEO, Region I
Region: Region I

Follow the peso

1 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2024 · ₱40,000 (shared by many projects, not this project's own line)

    Possible match · score 0.83

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 24AE0102 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    88% reported · imagery 2022-04-15 → 2025-01-26

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - CONSTRUCTION OF SLOPE PROTECTION STRUCTURE - CONSTRUCTION OF SLOPE PROTECTION, BARANGAY BUGBUGCAO -BARANGAY PACPACAC, STA. 1+331.60 - STA. 1+980, SAN JUAN, LA UNION

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 83%

UACS
18001
Amount
₱40,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Mitigating Structure, Barangay IV and Ilocanos Sur, San Fernando, La Union
GAA fiscal year
FY2024
DBM GAA source document

2. Allotment

Agency-level releases for FY2024, not tied to this contract

La Union 1st DEO · SARO 1,917 (₱267,033,855,698.00) · NCA 1,287 (₱846,238,484,493.07)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

D

120 projects · ₱11.6B total · 12 flags

Other projects by this contractor

No sat.

REHABILITATION OF NORTH NAVOTAS PUMPING STATION AND NAVOTAS NAVIGATION GATE (PHASE 3), NAVOTAS CITY (RE-ADVERTISEMENT)

National Capital Region, National Capital Region

2024₱281.2M
Past target date (DPWH On-Going)
No sat.

CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF ROAD DIKE, PANGALAAN RIVER, BRGY. TIGKAN SECTION (DOWNSTREAM LS), PACKAGE C, NAUJAN, OR. MINDORO

Region IV-B, Region IV-B

2025₱276.1M
Past target date (DPWH On-Going)
No sat.

COASTAL ROADS/CAUSEWAY FOR ENVIRONMENTAL PROTECTION/CONSERVATION- CONST. OF COASTAL ROAD, BRGY. SAN ANTONIO SECTION, NAUJAN, ORIENTAL MINDORO

Region IV-B, Region IV-B

2025₱276.1M
Past target date (DPWH On-Going)
No sat.

CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF ROAD DIKE, PANGALAAN RIVER, BRGY. TIGKAN SECTION (LS), PACKAGE B, NAUJAN, OR. MINDORO

Region IV-B, Region IV-B

2025₱276.0M
Past target date (DPWH On-Going)
No sat.

BASIC INFRASTRUCTURE PROGRAM (BIP)- COASTAL ROADS/CAUSEWAY FOR ENVIRONMENTAL PROTECTION/CONSERVATION- CONST. OF LIGAYA-STA. LUCIA COASTAL ROAD (STA. LUCIA SECTION), SABLAYAN, OCC. MINDORO

Region IV-B, Region IV-B

2024₱247.5M
Past target date (DPWH On-Going)
No sat.

BASIC INFRASTRUCTURE PROGRAM (BIP)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF ILVITA RIVERBANK PROTECTION WORKS ALONG AMNAY RIVER (DOWNSTREAM), SABLAYAN, OCC. MINDORO

Region IV-B, Region IV-B

2024₱238.3M
Past target date (DPWH On-Going)
View all 120 projects →

4. Implementation

Contract Amount

₱144,747,995.50

Progress

Past target date (DPWH On-Going)

Start Date

July 19, 2024

Target End

August 11, 2025

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region I (Ilocos Region)La UnionSan JuanBugbugcao
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
Flood (100-yr rain)Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.