Roads16HH0088

REHABILITATION / RECONSTRUCTION / UPGRADING OF DAMAGED PAVED NATIONAL ROADS INCLUDING DRAINAGE BASED ON PAVEMENT MANAGEMENT SYSTEM / HIGHWAY DEVELOPMENT AND MANAGEMENT (HDM-4) (INTERMITTENT SECTIONS) (SECONDARY ROAD), S. OSMEÑABLVD., CHAINAGE 0000-0200 (S

REHABILITATION / RECONSTRUCTION / UPGRADING OF DAMAGED PAVED NATIONAL ROADS INCLUDING DRAINAGE BASED ON PAVEMENT MANAGEMENT SYSTEM / HIGHWAY DEVELOPMENT AND MANAGEMENT (HDM-4) (INTERMITTENT SECTIONS) (SECONDARY ROAD), S. OSMEÑABLVD., CHAINAGE 0000-0200 (S is a DPWH-tracked public work in Cebu City DEO, Region VII. Reported contract value: ₱7,054,876.26. Status: Reported complete (DPWH). Contractor on record: A T TAN CONST CORP. Figures trace to dpwh.

Cebu City DEO, Region VII
Region: Region VII

Follow the peso

2 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2017 · ₱8,000 (shared by many projects, not this project's own line)

    Possible match · score 0.82

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-BMB-D-17-0022755 · ₱2,108,129 · release to the district office, not itemized per project

    Possible match · score 0.71

    DBM release source ↗
  3. 3. PhilGEPS award

    ₱7,054,886 · A. T. TAN CONSTRUCTION

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · imagery 2015-05-15 → 2025-06-07

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: REHABILITATION / RECONSTRUCTION / UPGRADING OF DAMAGED PAVED NATIONAL ROADS INCLUDING DRAINAGE BASED ON PAVEMENT MANAGEMENT SYSTEM / HIGHWAY DEVELOPMENT AND MANAGEMENT (HDM-4) (INTERMITTENT SECTIONS) (SECONDARY ROAD), S. OSMEÑABLVD., CHAINAGE 0000-0200 (S

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 82%

UACS
18001
Amount
₱8,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction/Maintenance of Flood Control Mitigation Structures (SWIMP) at Brgy. Sirao and Brgy. Malubog, Cebu City
GAA fiscal year
FY2017
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-BMB-D-17-0022755

₱2,108,129.00 · FY2017

Released to Philippine Air For ( Air Forces ) (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

Confirmed (exact contract ID) · 100%

Rehabilitation / Reconstruction / Upgrading of Dam

₱7,054,885.97 · A. T. TAN CONSTRUCTION

Contractor

B

16 projects · ₱414.0M total · 0 flags

Other projects by this contractor

No sat.

OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD MITIGATION STRUCTURE AT BUTUANON RIVER, BRGY. PULANGBATO, CEBU CI

Cebu City DEO, Region VII

2019₱62.3M
Reported complete (DPWH)
No sat.

OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD MITIGATION STRUCTURE AT BUTUANON RIVER, BRGY. PIT-OS, CEBU CIT

Cebu City DEO, Region VII

2019₱58.5M
Reported complete (DPWH)
No sat.

OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD MITIGATION STRUCTURE AT BUTUANON RIVER, BRGY. BACAYAN, CEBU C

Cebu City DEO, Region VII

2019₱50.8M
Reported complete (DPWH)
No sat.

CONSTRUCTION / MAINTENANCE OF FLOOD CONTROL MITIGATION STRUCTURES / REPLACEMENT OF EXISTING T. PADILLA BOX CULVERT TO FLAT SLAB BRIDGE INCLUDING RIVER BANK PROTECTION, CEBU CITY

Cebu City DEO, Region VII

2017₱48.5M
Reported complete (DPWH)
No sat.

OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE -TERTIARY ROADS- CEBU-GUADALUPE RD - (S00065CB) CHAINAGE 000 - CHAINAGE 1616, (S00171CB) - CHAINAGE 000 - CHAINAGE 462, CEBU CITY

Cebu City DEO, Region VII

2022₱38.4M
Reported complete (DPWH)
No sat.

CONSTRUCTION OF FOUR(4) STOREY, TWELVE(12) CLASSROOM SCHOOL BUILDING AT BINALIW HIGH SCHOOL, BRGY. BINALIW, CEBU CITY

Cebu City DEO, Region VII

2017₱31.9M
Reported complete (DPWH)
View all 16 projects →

4. Implementation

Contract Amount

₱7,054,876.26

Progress

Reported complete (DPWH)

Start Date

March 22, 2017

Target End

June 19, 2017

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region VII (Central Visayas)City of CebuSan Roque
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
Flood (100-yr rain)Storm surgeDetails in Hazard context above.Full hazard check →
El Niño outlook (province)
No province on record.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.