Flood Control and Drainage19HH0058

OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD MITIGATION STRUCTURE AT BUTUANON RIVER, BRGY. PULANGBATO, CEBU CI

OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD MITIGATION STRUCTURE AT BUTUANON RIVER, BRGY. PULANGBATO, CEBU CI is a DPWH-tracked public work in Cebu City DEO, Region VII. Reported contract value: ₱62,262,765.00. Status: Reported complete (DPWH). Contractor on record: A T TAN CONST CORP. Figures trace to dpwh.

Cebu City DEO, Region VII
Region: Region VII

Follow the peso

2 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    No GAA line found for this project's office and year. The GAA lists budgets by program and office, not always by project.

  2. 2. SARO / NCA release

    NCA NCA-ROIII-19-0011181 · ₱6,992,000 · release to the district office, not itemized per project

    Possible match · score 0.69

    DBM release source ↗
  3. 3. PhilGEPS award

    ₱62,262,765

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · imagery 2018-03-17 → 2026-02-04

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Site vs flood hazard · Project NOAH 100-year map

High flood hazard · Cebu

Based on the coordinates published with the DPWH record and NOAH file Cebu.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION /  MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD MITIGATION STRUCTURE AT BUTUANON RIVER, BRGY. PULANGBATO, CEBU CI

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

No matching GAA line found for this project in the FY2019 GAA. DBM GAA FY2019

2. Allotment

Office-level release, not tied to this specific contract

NCA NCA-ROIII-19-0011181

₱6,992,000.00 · FY2019

Released to Regional Science High School (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM NCA listing (source)

3. Procurement & Award

Confirmed (exact contract ID) · 100%

OO2 PROTECT LIVES AND PROPERTIES AGAINST MAJOR FL

₱62,262,765.00 · Awardee from PhilGEPS

Award / contract ref: 19HH0058

Contractor

B

16 projects · ₱414.0M total · 0 flags

Other projects by this contractor

No sat.

OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD MITIGATION STRUCTURE AT BUTUANON RIVER, BRGY. PIT-OS, CEBU CIT

Cebu City DEO, Region VII

2019₱58.5M
Reported complete (DPWH)
No sat.

OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD MITIGATION STRUCTURE AT BUTUANON RIVER, BRGY. BACAYAN, CEBU C

Cebu City DEO, Region VII

2019₱50.8M
Reported complete (DPWH)
No sat.

CONSTRUCTION / MAINTENANCE OF FLOOD CONTROL MITIGATION STRUCTURES / REPLACEMENT OF EXISTING T. PADILLA BOX CULVERT TO FLAT SLAB BRIDGE INCLUDING RIVER BANK PROTECTION, CEBU CITY

Cebu City DEO, Region VII

2017₱48.5M
Reported complete (DPWH)
No sat.

OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE -TERTIARY ROADS- CEBU-GUADALUPE RD - (S00065CB) CHAINAGE 000 - CHAINAGE 1616, (S00171CB) - CHAINAGE 000 - CHAINAGE 462, CEBU CITY

Cebu City DEO, Region VII

2022₱38.4M
Reported complete (DPWH)
No sat.

CONSTRUCTION OF FOUR(4) STOREY, TWELVE(12) CLASSROOM SCHOOL BUILDING AT BINALIW HIGH SCHOOL, BRGY. BINALIW, CEBU CITY

Cebu City DEO, Region VII

2017₱31.9M
Reported complete (DPWH)
No sat.

CONSTRUCTION / IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS, BACAYAN-PIT-OS-PULANGBATO ROAD, LEADING TO SIRAO FLOWER GARDEN, WATERFALLS, BRGY. PIT-OS & PULANGBATO, CEBU CITY

Cebu City DEO, Region VII

2018₱31.0M
Reported complete (DPWH)
View all 16 projects →

4. Implementation

Contract Amount

₱62,262,765.00

Progress

Reported complete (DPWH)

Start Date

June 27, 2019

Target End

May 22, 2020

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region VII (Central Visayas)City of CebuPulangbato
Storms whose wind field reached it
Penha 2026Koto 2025Kalmaegi 2025
Hazard exposure
Flood (100-yr rain)Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No province on record.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.