Roads17DD0176No coordinates published by DPWH

CONCRETING OF A.) BRGY. TALISAY FMR; B.) BRGY. TALISAY PHASE 2 FMR; C.) BRGY. TALISAY PHASE 3 FMR, BRGY. TALISAY, LIPA CITY, BATANGAS

CONCRETING OF A.) BRGY. TALISAY FMR; B.) BRGY. TALISAY PHASE 2 FMR; C.) BRGY. TALISAY PHASE 3 FMR, BRGY. TALISAY, LIPA CITY, BATANGAS is a DPWH-tracked public work in Batangas 4th DEO, Region IV-A. Reported contract value: ₱5,970,000.00. Status: Reported complete (DPWH). Contractor on record: TONIJON CONST AND DEVELOPMENT INC FORMERLY: TONIJON CONST. Figures trace to dpwh.

Batangas 4th DEO, Region IV-A

DPWH did not publish coordinates for this project, so it cannot be placed on the map or checked with satellite images.

Region: Region IV-A

No before/after satellite images: DPWH has not published map coordinates for this project, so there is no location to image.

Follow the peso

1 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2017 · ₱25,000 (shared by many projects, not this project's own line)

    Possible match · score 0.81

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-BMB-E-17-0020346 · ₱409,941 · release to the district office, not itemized per project

    Possible match · score 0.60

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 17DD0176 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · no satellite pair yet

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONCRETING OF A.) BRGY. TALISAY FMR; B.) BRGY. TALISAY PHASE 2 FMR; C.) BRGY. TALISAY PHASE 3 FMR, BRGY. TALISAY, LIPA CITY, BATANGAS

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 81%

UACS
18001
Amount
₱25,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction/Improvement of Revetment with Floodwall along Downstream of Ibaan River, Ibaan, Batangas
GAA fiscal year
FY2017
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-BMB-E-17-0020346

₱409,941.00 · FY2017

Released to Regional Office - IV (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

A

101 projects · ₱661.0M total · 0 flags

Other projects by this contractor

No sat.

Construction of Flood Control Structure, Pinagsibaan Bridge 2, Rosario, Batangas

ROSARIO (BATANGAS), BATANGAS, Region IV-A

2023₱29.4M
Reported complete (DPWH)
No sat.

Construction of Flood Control Structure, Paninsingin Bridge, Rosario, Batangas

ROSARIO (BATANGAS), BATANGAS, Region IV-A

2023₱29.4M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MAHANADIONG BRIDGE, TAYSAN

Batangas 4th DEO, Region IV-A

2024₱29.4M
Reported complete (100% progress, DPWH status On-Going)
No sat.

ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG PINAGBAYANAN, TAYSAN, BATA

Batangas 4th DEO, Region IV-A

2024₱29.4M
Reported complete (100% progress, DPWH status On-Going)
No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, OFF - CARRIAGEWAY IMPROVEMENT - TERTIARY ROADS, SN JUAN-LAIYA RD - K0151 + 510 - K0151 + 808, K0151 + 815 - K0152 + 940

Batangas 4th DEO, Region IV-A

2022₱22.3M
Reported complete (DPWH)
No sat.

LOCAL PROGRAM, CONSTRUCTION/ REPAIR/ REHABILITATION/ IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS, LOCAL ROADS AND BRIDGES, LOCAL ROADS, CONSTRUCTION OF ROAD WITH LINE CANAL AT BRGY. CAWONGAN AND POBLACION, PADRE GARCIA, BATANGAS

Batangas 4th DEO, Region IV-A

2019₱19.0M
Reported complete (DPWH)
View all 101 projects →

4. Implementation

Contract Amount

₱5,970,000.00

Progress

Reported complete (DPWH)

Start Date

August 24, 2017

Target End

February 4, 2018

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region IV-A (CALABARZON)Batangas
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.