Roads21PL0113

CONCRETING OF BRGY. SUYANG FMR, BRGY. SUYANG, TABUK CITY, KALINGA

CONCRETING OF BRGY. SUYANG FMR, BRGY. SUYANG, TABUK CITY, KALINGA is a DPWH-tracked public work in Lower Kalinga DEO, Cordillera Administrative Region. Reported contract value: ₱11,940,030.00. Status: Reported complete (DPWH). Contractor on record: JBC BUILDERS. Figures trace to dpwh.

Lower Kalinga DEO, Cordillera Administrative Region
Region: Cordillera Administrative Region

Follow the peso

2 of 5 steps linked to this project. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2021 · ₱2,000

    Probable match · score 0.88

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 21PL0113 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2020-02-29 → 2023-08-08

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONCRETING OF BRGY. SUYANG FMR, BRGY. SUYANG, TABUK CITY, KALINGA

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 88%

UACS
18001
Amount
₱2,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Continuation of Suyang Flood Control along Chico River, Suyang, Tabuk City, Kalinga
GAA fiscal year
FY2021
DBM GAA source document

2. Allotment

Agency-level releases for FY2021, not tied to this contract

Lower Kalinga DEO · SARO 1,294 (₱130,951,870,166.00) · NCA 1,353 (₱701,960,015,999.00)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

C

18 projects · ₱131.1M total · 0 flags

Other projects by this contractor

No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF CAMPA TO MAPAOAY ACCESS ROAD, BARANGAY IPIL, TABUK

Lower Kalinga DEO, Cordillera Administrative Region

2023₱29.7M
Past target date (DPWH On-Going)
No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - ROAD WIDENING - SECONDARY ROADS - MT PROVINCE BDRY-CALANAN-PINUKPUK-ABBUT RD (CAGALUAN-CALANAN SECTION) - K0494 + 149 - K0494 + 728

Lower Kalinga DEO, Cordillera Administrative Region

2024₱20.7M
Past target date (DPWH On-Going)
No sat.

CONSTRUCTION OF FLOOD CONTROL STRUCTURE IN BARANGAY CABARUAN, TABUK CITY, KALINGA

Lower Kalinga DEO, Cordillera Administrative Region

2021₱14.8M
Reported complete (DPWH)
No sat.

CONCRETING OF BRGY. SUYANG FMR PHASE II, BRGY. SUYANG, TABUK CITY, KALINGA

Lower Kalinga DEO, Cordillera Administrative Region

2022₱11.9M
Reported complete (DPWH)
No sat.

CONCRETING OF BRGY. MAGNAO FMR, BRGY. MAGNAO, TABUK CITY, KALINGA

Lower Kalinga DEO, Cordillera Administrative Region

2022₱11.9M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT LIWAN EAST-CALAOCAN ALONG PA

Lower Kalinga DEO, Cordillera Administrative Region

2024₱9.8M
Past target date (DPWH On-Going)
View all 18 projects →

4. Implementation

Contract Amount

₱11,940,030.00

Progress

Reported complete (DPWH)

Start Date

August 5, 2021

Target End

March 7, 2022

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Cite this record

Love the Philippines. “CONCRETING OF BRGY. SUYANG FMR, BRGY. SUYANG, TABUK CITY, KALINGA.” Source: DPWH. Data as of October 21, 2026. https://lovethephilippines.com/projects/3d7c46a9-d364-4a38-b6fa-fc4acefb33ed

The official source record is authoritative. An indicator on this site is not a finding of wrongdoing.

Connected records

Where this project sits

Place (PSGC)
Cordillera Administrative Region (CAR)KalingaCity of TabukBalawag
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
LandslideDetails in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.