Roads20DL0069

A. ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM 2. NETWORK DEVELOPMENT PROGRAM A. ROAD WIDENING 1. PRIMARY ROAD 1. DAANG MAHARLIKA (LZ)-K0143+000- K0143+332, K0143+392-K0143+449, K0144+099-K0145+179

A. ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM 2. NETWORK DEVELOPMENT PROGRAM A. ROAD WIDENING 1. PRIMARY ROAD 1. DAANG MAHARLIKA (LZ)-K0143+000- K0143+332, K0143+392-K0143+449, K0144+099-K0145+179 is a DPWH-tracked public work in Quezon 4th DEO, Region IV-A. Reported contract value: ₱61,423,215.00. Status: Reported complete (DPWH). Contractor on record: RAM BUILDERS. Figures trace to dpwh.

Quezon 4th DEO, Region IV-A
Region: Region IV-A

Follow the peso

1 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2020 · ₱10,000 (shared by many projects, not this project's own line)

    Possible match · score 0.80

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 20DL0069 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2013-03-30 → 2021-06-25

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Unit-cost benchmark · Road, cost per km (widening)

₱41,812,944 per km= 1.0x the Region IV-A median (n=330)

Contract cost ₱61,423,215 ÷ 1.469 km read from the DPWH title (“K0143+000- K0143+332; K0143+392-K0143+449; K0144+099-K0145+179”; K-post / station range length). National percentile: 71. Higher unit cost can have legitimate causes (terrain, design, scope not stated in the title); this is a comparison, not a finding. Methodology

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: A. ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM 2. NETWORK DEVELOPMENT PROGRAM A. ROAD WIDENING 1. PRIMARY ROAD 1. DAANG MAHARLIKA (LZ)-K0143+000- K0143+332, K0143+392-K0143+449, K0144+099-K0145+179

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 80%

UACS
18001
Amount
₱10,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction/ Rehabilitation of Flood Control Structures along Boong River, Brgys. Villa Victoria and Bacong, Alabat, Quezon
GAA fiscal year
FY2020
DBM GAA source document

2. Allotment

Agency-level releases for FY2020, not tied to this contract

Quezon 4th DEO · SARO 1,970 (₱160,521,624,356.00) · NCA 998 (₱407,918,568,220.27)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

A

130 projects · ₱2.7B total · 2 flags

Other projects by this contractor

No sat.

A. ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM 1. ASSET PRESERVATION PROGRAM A. REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE 1. TERTIARY ROADS 1. JCT MSR-OLD ZIGZAG RD - K0

Quezon 4th DEO, Region IV-A

2019₱94.6M
Reported complete (DPWH)
No sat.

I. OPERATIONS A. ORGANIZATIONAL OUTCOME 1. ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM 2. NETWORK DEVELOPMENT PROGRAM C. CONSTRUCTION OF MISSING LINKS/ NEW ROADS 3. QUEZON-ALABAT-PEREZ CIRCUMFERENTIAL ROAD, INCL. ROW, QUEZON

Quezon 4th DEO, Region IV-A

2018₱88.9M
Reported complete (DPWH)
No sat.

A. MFO -1 NATIONAL ROAD NETWORK SERVICES 1. ASSET PRESERVATION OF NATIONAL ROADS D. CONSTRUCTION/UPGRADING REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS 2. TERTIARY ROADS B. QUEZON-ALABAT-PEREZ RD - K0001+182-K0001+782, K0020+00-K0020+600, K0030+037-K

Quezon 4th DEO, Region IV-A

2017₱83.7M
Reported complete (DPWH)
No sat.

A. ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM 1. ASSET PRESERVATION PROGRAM D. REHABILITATION / RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE 1. PRIMARY ROADS 1. JCT MSR-OLD ZIGZAG RD - K0153+236 - K0153+25

Quezon 4th DEO, Region IV-A

2020₱78.8M
Reported complete (DPWH)
No sat.

A. MFO -1: NATIONAL ROAD NETWORK SERVICES 2. NETWORK DEVELOPMENT A. IMPROVEMENT/WIDENING OF NATIONAL ROADS 1. PRIMARY ROADS A. ALONG N1 1. DAANG MAHARLIKA (LZ) - K0135+ -732 - K0135+ -332, K0137+000 - K0138+016, K0139+000 - K0139+093, K0139+324 - K0140+2

Quezon 4th DEO, Region IV-A

2017₱76.0M
Reported complete (DPWH)
No sat.

A. ORGANIZATIONAL OUTCOME 1. ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM 1. ASSET PRESERVATION PROGRAM A. REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDES 1. TERTIATY ROADS 1. JCT MSR-OLD ZIGZAG RD - JCT. MSR-OLD ZIGZAG

Quezon 4th DEO, Region IV-A

2018₱70.2M
Reported complete (DPWH)
View all 130 projects →

4. Implementation

Contract Amount

₱61,423,215.00

Progress

Reported complete (DPWH)

Start Date

February 12, 2020

Target End

November 7, 2020

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region IV-A (CALABARZON)QuezonPagbilaoIbabang Palsabangon
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
LandslideDetails in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.