Construction of Revetment22KB0071

Construction of Revetment, Downstream and Upstream of Kanapolo Bridge along Kanapolo Creek, Kibawe, Bukidnon

Construction of Revetment, Downstream and Upstream of Kanapolo Bridge along Kanapolo Creek, Kibawe, Bukidnon is a DPWH-tracked public work in KIBAWE (BUKIDNON), BUKIDNON, Region X. Reported contract value: ₱23,520,000.00. Status: Reported complete (DPWH). Contractor on record: PYRAMID CONSOLIDATED BUILDERS & GEN MDSE. Figures trace to sumbong.

KIBAWE (BUKIDNON), BUKIDNON, Region X
Region: Region X

Follow the peso

3 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2022 · ₱35,000

    Probable match · score 0.88

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-ROX-22-0005381 · ₱5,751,000

    Possible match · score 0.60

    DBM release source ↗
  3. 3. PhilGEPS award

    ₱22,875,272 · PYRAMID CONSOLIDATED BUILDERS & GENERAL MERCHANDISE

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · imagery 2019-07-19 → 2025-11-17

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Site vs flood hazard · Project NOAH 100-year map

High flood hazard · Bukidnon

Based on the coordinates published with the DPWH record and NOAH file Bukidnon.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: Construction of Revetment, Downstream and Upstream of Kanapolo Bridge along Kanapolo Creek, Kibawe, Bukidnon

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 88%

UACS
18001
Amount
₱35,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Sagayaran Bridge including approaches and flood control, Kinura, Kalilangan, Bukidnon (Phase 1)
GAA fiscal year
FY2022
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-ROX-22-0005381

₱5,751,000.00 · FY2022

DBM SARO listing (source)

Office-level release, not tied to this specific contract

SARO SARO-BMB-A-22-0003123

₱718,520,000.00 · FY2022

DBM SARO listing (source)

Office-level release, not tied to this specific contract

SARO SARO-ROX-22-0005382

₱572,000.00 · FY2022

DBM SARO listing (source)

Office-level release, not tied to this specific contract

SARO SARO-BMB-A-22-0003061

₱3,000,000.00 · FY2022

DBM SARO listing (source)

Office-level release, not tied to this specific contract

SARO SARO-ROX-22-0010240

₱100,000,000.00 · FY2022

DBM SARO listing (source)

3. Procurement & Award

Confirmed (exact contract ID) · 100%

Revetment

₱22,875,271.77 · PYRAMID CONSOLIDATED BUILDERS & GENERAL MERCHANDISE

Award / contract ref: 22KB0071

4. Implementation

Contract Amount

₱23,520,000.00

Progress

Reported complete (DPWH)

Start Date

February 15, 2022

Target End

November 11, 2022

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region X (Northern Mindanao)BukidnonDangcaganBarongcot
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
Flood (100-yr rain)Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.