Roads25E00255

SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF EAST COASTAL ROAD, BRGY. BAGONG SILANG SECTION, STA. 000+446-STA. 000+660,

SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF EAST COASTAL ROAD, BRGY. BAGONG SILANG SECTION, STA. 000+446-STA. 000+660, is a DPWH-tracked public work in Region IV-B, Region IV-B. Reported contract value: ₱233,288,092.59. Status: Past target date (DPWH On-Going). Contractor on record: ELIMARED CONST AND TRADING INC. Figures trace to dpwh.

Region IV-B, Region IV-B
Region: Region IV-B

Follow the peso

2 of 5 steps linked to this project. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    No GAA line found for this project's office and year. The GAA lists budgets by program and office, not always by project.

  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    ₱233,288,093 · ELIMARED CONST AND TRADING INC

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    29% reported · imagery 2024-12-13 → 2025-06-02

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF EAST COASTAL ROAD, BRGY. BAGONG SILANG SECTION, STA. 000+446-STA. 000+660,

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

No matching GAA line found for this project in the FY2025 GAA. DBM GAA FY2025

2. Allotment

No matching SARO/NCA release found for this project. Source: DBM SARO/NCA listings.

3. Procurement & Award

Confirmed (exact contract ID) · 100%

25E00255

₱233,288,092.59 · ELIMARED CONST AND TRADING INC

Contractor

D

9 projects · ₱1.4B total · 0 flags

Other projects by this contractor

No sat.

SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF TENEGUIBAN ACCESS ROAD, STA. 0+000.00-STA. 2+025.00; STA. 2+716.00-STA. 4

Region IV-B, Region IV-B

2025₱279.9M
Past target date (DPWH On-Going)
No sat.

SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- CONST. OF PALAWAN EAST COASTAL ROAD PACKAGE B, STA. 000+220-STA. 000+446, PTO. PRINCESA, PALAWAN

Region IV-B, Region IV-B

2025₱233.5M
Past target date (DPWH On-Going)
No sat.

SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- COASTAL ROADS TO AUGMENT RESILIENCY OF COASTAL COMMUNITIES- CONST. OF PALAWAN EAST COASTAL ROAD, PACKAGE A, STA. 000+000-STA. 000+219.65, PTO. PRINCESA,PALAWAN

Region IV-B, Region IV-B

2025₱233.3M
Past target date (DPWH On-Going)
No sat.

IMPROVEMENT OF VARIOUS INFRASTRUCTURES IN SUPPORT OF NATIONAL SECURITY (TATAG NG IMPRASTRAKTURA PARA SA KAPAYAPAAN AT SEGURIDAD PROGRAM-TIKAS) CONSTRUCTION OF BALABAC MILITARY RUNWAY, STA. 0+000-STA. 3+000, BALABAC, PALAWAN

Region IV-B, Region IV-B

2021₱193.0M
Reported complete (DPWH)
No sat.

CONST./IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATION (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP) BALABAC CIRCUMFERENTIAL ROAD, BALABAC, PALAWAN

Region IV-B, Region IV-B

2023₱126.7M
Reported complete (DPWH)
No sat.

CONSTRUCTION/IMPROVEMENT OF NEW QUEZON-CHEEY-SAN JOSE-DECALACHAO ROAD LEADING TO BUSUANGA AIRPORT, PACKAGE A, BUSUANGA, PALAWAN

Palawan 1st DEO, Region IV-B

2025₱96.2M
Past target date (DPWH On-Going)
View all 9 projects →

4. Implementation

Contract Amount

₱233,288,092.59

Progress

Past target date (DPWH On-Going)

Start Date

April 6, 2025

Target End

March 31, 2026

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Not yet linked to a PSGC area.
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No province on record.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.