Roads17EI0043No coordinates published by DPWH

REPAIR/REHABILITATION AND CONCRETING OF BRGY. TUOG, HAPPY VALLEY, ROXAS, ORIENTAL MINDORO

REPAIR/REHABILITATION AND CONCRETING OF BRGY. TUOG, HAPPY VALLEY, ROXAS, ORIENTAL MINDORO is a DPWH-tracked public work in Southern Mindoro DEO, Region IV-B. Reported contract value: ₱9,598,014.78. Status: Reported complete (DPWH). Contractor on record: D M MALIWANAG BUILDERS AND ENT. Figures trace to dpwh.

Southern Mindoro DEO, Region IV-B

DPWH did not publish coordinates for this project, so it cannot be placed on the map or checked with satellite images.

Region: Region IV-B

No before/after satellite images: DPWH has not published map coordinates for this project, so there is no location to image.

Follow the peso

3 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2017 · ₱10,000

    Probable match · score 0.86

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-ROXI-17-0016505 · ₱3,040,860 · release to the district office, not itemized per project

    Possible match · score 0.66

    DBM release source ↗
  3. 3. PhilGEPS award

    ₱9,598,015 · D.M. MALIWANAG BUILDERS AND ENTERPRISES

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · no satellite pair yet

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: REPAIR/REHABILITATION AND CONCRETING OF BRGY. TUOG, HAPPY VALLEY, ROXAS, ORIENTAL MINDORO

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 86%

UACS
18001
Amount
₱10,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Baroc River, Roxas, Oriental Mindoro
GAA fiscal year
FY2017
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-ROXI-17-0016505

₱3,040,860.00 · FY2017

Released to 000000 - Southern Per hilippines Agri-Business and tea ne and Aquatic School of echnology (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

Confirmed (exact contract ID) · 100%

Rep/Rehab and Conc of Brgy. Tuog,Happy Valley, Rox

₱9,598,014.78 · D.M. MALIWANAG BUILDERS AND ENTERPRISES

Award / contract ref: 17EI0043

Contractor

A

63 projects · ₱1.1B total · 0 flags

4. Implementation

Contract Amount

₱9,598,014.78

Progress

Reported complete (DPWH)

Start Date

March 16, 2017

Target End

June 13, 2017

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Not yet linked to a PSGC area.
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No province on record.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.