GAA 2017 LFP17FG0030

INDV. PROJ. REHABILITATION/CONCRETE PAVING OF DAO STREET, STO. DOMINGO-LA PURISIMA ROAD, IRIGA CITY STA. 0+000 - STA. 1+317

INDV. PROJ. REHABILITATION/CONCRETE PAVING OF DAO STREET, STO. DOMINGO-LA PURISIMA ROAD, IRIGA CITY STA. 0+000 - STA. 1+317 is a DPWH-tracked public work in Camarines Sur 5th DEO, Region V. Reported contract value: ₱18,141,888.13. Status: Reported complete (DPWH). Contractor on record: HGG BUILDERS. Figures trace to dpwh.

Camarines Sur 5th DEO, Region V
Region: Region V

Follow the peso

1 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2017 · ₱45,000 (shared by many projects, not this project's own line)

    Possible match · score 0.81

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-ROV-17-0009159 · ₱86,116 · release to the district office, not itemized per project

    Possible match · score 0.64

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 17FG0030 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2015-12-26 → 2025-05-31

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Unit-cost benchmark · Road, cost per km (rehabilitation / reconstruction)

₱13,775,162 per km= 0.4x the Region V median (n=146)

Contract cost ₱18,141,888 ÷ 1.317 km read from the DPWH title (“STA. 0+000 - STA. 1+317”; K-post / station range length). National percentile: 7. Higher unit cost can have legitimate causes (terrain, design, scope not stated in the title); this is a comparison, not a finding. Methodology

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: INDV. PROJ.  REHABILITATION/CONCRETE PAVING OF DAO STREET, STO. DOMINGO-LA PURISIMA ROAD, IRIGA CITY STA. 0+000 - STA. 1+317

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 81%

UACS
18001
Amount
₱45,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction/Rehabilitation/Improvement of Bicol River Flood Control,Mabolo, Naga City to Tarusanan, Camaligan Section, Camarines Sur
GAA fiscal year
FY2017
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-ROV-17-0009159

₱86,116.00 · FY2017

Released to Division of Camarines Norte (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

C

233 projects · ₱17.1B total · 0 flags

Other projects by this contractor

No sat.

SUSTAINABLE INFRASTUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- COASTAL ROADS TO AUGMENTRESILIENCY OF COASTAL COMMUNITIES- CONST. OF COASTAL ROAD/SHORE PROTECTION ALONG ESTRELLA, STA. 000+000-STA. 000+616.85, NAUJAN, OR. MINDORO

Region IV-B, Region IV-B

2025₱277.2M
Past target date (DPWH On-Going)
No sat.

CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF ROAD DIKE ALONG BUCAYAO RIVER, (UPSTREAM), BRGY. MULAWIN-BRGY. DEL PILAR, NAUJAN,

Region IV-B, Region IV-B

2025₱276.0M
Past target date (DPWH On-Going)
No sat.

CLUSTER 22: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- REHAB. OF ROAD WITH SLIPS, SLOPE CIOLLAPSE AND LANDSLIDE ALONG TAYTAY-BANTULAN-STA. CRUZ PORT ROAD, 22.1: STA. 1+026-STA. 1+161 (R/S); 22.2: STA. 1+057-STA. 1+164 (L/S); 22.3: STA.

Region IV-B, Region IV-B

2022₱252.4M
Past target date (DPWH On-Going)
No sat.

OO 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MGMT. PROG., CONST./ REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONST. OF LOBOC RIVER CONTROL STRUCTURE, POBLACION SAWANG, RIGHT SIDE PHASE 1, LOBOC,

Region VII, Region VII

2024₱241.2M
Past target date (DPWH On-Going)
No sat.

FLOOD MANAGEMENT PROGRAM- CONST./MAINT. OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS- CONST. OF MOGPOG SHORE PROTECTION/BOULEVARD, MOGPOG, MARINDUQUE

Region IV-B, Region IV-B

2024₱241.2M
Past target date (DPWH On-Going)
No sat.

CONSTRUCTION OF LIPA-MATAAS NA KAHOY ROAD INCLUDING URBAN DRAINAGE DEVELOPMENT AND ROAD SAFETY DEVICES, BATANGAS

Region IV-A, Region IV-A

2023₱241.2M
Past target date (DPWH On-Going)
View all 233 projects →

4. Implementation

Contract Amount

₱18,141,888.13

Progress

Reported complete (DPWH)

Start Date

March 28, 2017

Target End

July 14, 2017

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region V (Bicol Region)Camarines SurCity of IrigaSanto Domingo
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
Flood (100-yr rain)Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.