Buildings and Facilities21JG0036

CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. COLOJO, PITOGO, ZAMBOANGA DEL SUR

CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. COLOJO, PITOGO, ZAMBOANGA DEL SUR is a DPWH-tracked public work in Zamboanga del Sur 2nd DEO, Region IX. Reported contract value: ₱498,495.92. Status: Reported complete (DPWH). Contractor on record: AFS CONST AND ENT. Figures trace to dpwh.

Zamboanga del Sur 2nd DEO, Region IX
Region: Region IX

Follow the peso

2 of 5 steps linked to this project. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2021 · ₱24,869

    Probable match · score 0.88

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 21JG0036 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2021-01-28 → 2021-01-28

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. COLOJO, PITOGO, ZAMBOANGA DEL SUR

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 88%

UACS
18001
Amount
₱24,869,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Project in Sibuguey River, Brgy. Kahayagan, Bayog, Zamboanga del Sur
GAA fiscal year
FY2021
DBM GAA source document

2. Allotment

Agency-level releases for FY2021, not tied to this contract

Zamboanga del Sur 2nd DEO · SARO 1,294 (₱130,951,870,166.00) · NCA 1,353 (₱701,960,015,999.00)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

C

49 projects · ₱254.6M total · 0 flags

Other projects by this contractor

No sat.

SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) CONSTRUCTION OF REGIONAL GOVERNMENT CENTER ( PERIMETER FENCE), PAGADIAN CITY, ZAMBOANGA DEL SUR

Zamboanga del Sur 1st DEO, Region IX

2022₱20.9M
Reported complete (DPWH)
No sat.

ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ROAD, BRGY. GAWIL TO BOLISONG ROAD, KUMALARANG, ZAMBOANGA DEL SUR

Zamboanga del Sur 2nd DEO, Region IX

2022₱14.2M
Reported complete (DPWH)
No sat.

SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) CONSTRUCTION OF ROAD, BARANGAY COMMONWEALTH, BARANGAY PANAGHIUSA, BARANGAY BAKI, AURORA, ZAMBOANGA DEL SUR

Zamboanga del Sur 1st DEO, Region IX

2022₱13.9M
Reported complete (DPWH)
No sat.

CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO SEAPORTS (KALSADA TUNGO SA PALIPARAN, RILES AT DAUNGAN PROGRAM - KATUPARAN) ALONG REBOKON-PALARAN-TUBO PAIT-SACBULAN-SENIOR-SAGASAN ROAD LEADING TO SAN PABLO PORT, SAN PABLO, ZAMBOANGA DEL SUR

Zamboanga del Sur 2nd DEO, Region IX

2022₱12.9M
Reported complete (100% progress, DPWH status On-Going)
No sat.

REHABILITATION OF MULTI-PURPOSE BUILDING (MUNICIPAL HALL), BRGY. POBLACION, SAN MIGUEL, ZAMBOANGA DEL SUR

Zamboanga del Sur 2nd DEO, Region IX

2021₱12.4M
Reported complete (DPWH)
No sat.

CONSTRUCTION OF ROAD FROM NRJ ZAMBOANGA DEL SUR COASTAL ROAD LEADING TO SANCTUARY (GUINICOLALAY-NIAN-TARAKAN-BUBUAL ROAD), DINAS & SAN PABLO, ZAMBOANGA DEL SUR

Zamboanga del Sur 2nd DEO, Region IX

2021₱12.1M
Reported complete (DPWH)
View all 49 projects →

4. Implementation

Contract Amount

₱498,495.92

Progress

Reported complete (DPWH)

Start Date

February 15, 2021

Target End

March 19, 2021

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Cite this record

Love the Philippines. “CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. COLOJO, PITOGO, ZAMBOANGA DEL SUR.” Source: DPWH. Data as of October 21, 2026. https://lovethephilippines.com/projects/40618c89-c9c4-4b58-9425-ab006e44f57c

The official source record is authoritative. An indicator on this site is not a finding of wrongdoing.

Connected records

Where this project sits

Place (PSGC)
Region IX (Zamboanga Peninsula)Zamboanga del SurPitogoColojo
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
Flood (100-yr rain)Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.