GAA 2016 Locally Funded Projects15DI0200No coordinates published by DPWH

CONSTRUCTION/ REPAIR/ REHABILITATION/ IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS - CONCRETING/ REHABILITATION OF ROAD, BRGY. GANADO, LAGUNA 1ST L.D.

CONSTRUCTION/ REPAIR/ REHABILITATION/ IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS - CONCRETING/ REHABILITATION OF ROAD, BRGY. GANADO, LAGUNA 1ST L.D. is a DPWH-tracked public work in Laguna 2nd DEO, Region IV-A. Reported contract value: ₱17,285,103.57. Status: Reported complete (DPWH). Contractor on record: C T LEONCIO CONST. Figures trace to dpwh.

Laguna 2nd DEO, Region IV-A

DPWH did not publish coordinates for this project, so it cannot be placed on the map or checked with satellite images.

Region: Region IV-A

No before/after satellite images: DPWH has not published map coordinates for this project, so there is no location to image.

Follow the peso

1 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2016 · ₱50,000 (shared by many projects, not this project's own line)

    Possible match · score 0.83

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-ROXI-16-0032347 · ₱127,844 · release to the district office, not itemized per project

    Possible match · score 0.63

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 15DI0200 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · no satellite pair yet

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION/ REPAIR/ REHABILITATION/ IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS - CONCRETING/ REHABILITATION OF ROAD, BRGY. GANADO, LAGUNA 1ST L.D.

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 83%

UACS
18001
Amount
₱50,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Flood Control Construction of Revetment at San Isidro River, Brgy. San Antonio and Brgy. San Vicente, San Pedro City, Laguna
GAA fiscal year
FY2016
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-ROXI-16-0032347

₱127,844.00 · FY2016

Released to Heracleo Casco Memorial National High School Re (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

409 projects · ₱21.3B total · 0 flags

Other projects by this contractor

No sat.

CONSTRUCTION OF BALETE - SAN JOSE DIVERSION ROAD, MATAAS NA KAHOY SECTION (PHASE I), BATANGAS

Region IV-A, Region IV-A

2024₱188.2M
Past target date (DPWH On-Going)
No sat.

ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, CONSTRUCTION OF LIPA CITY-MATAAS NA KAHOY DIVERSION RD. LEADING TO TAAL CIRCUMFERENTIAL ROAD PHASE 7, BATAN

Batangas 4th DEO, Region IV-A

2024₱187.4M
Past target date (DPWH On-Going)
No sat.

MFO-1 - NAT'L. ROAD NETWORK SERVICES - WIDENING OF DAANG MAHARLIKA (TIAONG SECTION), QUEZON PROV.

Region IV-A, Region IV-A

2016₱178.5M
Reported complete (DPWH)
No sat.

BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES -CONSTRUCTION OF MULTI-PURPOSE BLDG. (TRAINING AND INSTRUCTIONAL FACILITY/MEETINGS INCENTIVES CONFERENCES FOR EDUCATION, SPORTS BUILDING (MICES) AND PRIMARY

Albay 2nd DEO, Region V

2024₱169.8M
Past target date (DPWH On-Going)
No sat.

CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF FLOOD CONTROL STRUCTURE, STO. NINO RIVER WATERWAYS ALONG ARAMAYWAN-BERONG-PTO. PRINCESA ROAD, PALAWAN

Region IV-B, Region IV-B

2025₱161.8M
Past target date (DPWH On-Going)
No sat.

ASSET PRESERVATION PROGRAM- REHAB./RECONST. OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE- SECONDARY ROADS, PUERO PRINCESANORTH ROAD, STA. 215+005-STA. 215+365, TAYTAY, PALAWAN

Region IV-B, Region IV-B

2023₱160.2M
Reported complete (DPWH)
View all 409 projects →

4. Implementation

Contract Amount

₱17,285,103.57

Progress

Reported complete (DPWH)

Start Date

January 28, 2016

Target End

March 7, 2017

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region IV-A (CALABARZON)Laguna
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.