Buildings and Facilities20FB0136

LOCAL INFRASTRUCTURE PROGRAM: CONSTRUCTION OF GOGON CENTRAL SCHOOL MULTI-PURPOSE BLDG., LEGAZPI CITY, ALBAY

LOCAL INFRASTRUCTURE PROGRAM: CONSTRUCTION OF GOGON CENTRAL SCHOOL MULTI-PURPOSE BLDG., LEGAZPI CITY, ALBAY is a DPWH-tracked public work in Albay 2nd DEO, Region V. Reported contract value: ₱6,912,850.00. Status: Reported complete (DPWH). Contractor on record: TWINCARE BUILDERS INC. Figures trace to dpwh.

Albay 2nd DEO, Region V
Region: Region V

Follow the peso

2 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2020 · ₱50,000 (shared by many projects, not this project's own line)

    Possible match · score 0.84

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    ₱6,912,850 · TWIN ACER BUILDERS AND SUPPLY

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · imagery 2019-12-29 → 2023-04-25

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: LOCAL INFRASTRUCTURE PROGRAM: CONSTRUCTION OF GOGON CENTRAL SCHOOL MULTI-PURPOSE BLDG., LEGAZPI CITY, ALBAY

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 84%

UACS
18001
Amount
₱50,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of drainage and flood mitigation structures along Brgy. Puro, Legazpi City, Albay
GAA fiscal year
FY2020
DBM GAA source document

2. Allotment

Agency-level releases for FY2020, not tied to this contract

Albay 2nd DEO · SARO 1,970 (₱160,521,624,356.00) · NCA 998 (₱407,918,568,220.27)

3. Procurement & Award

Confirmed (exact contract ID) · 100%

LIP - Const. of Gogon Central School, Legazpi City

₱6,912,850.00 · TWIN ACER BUILDERS AND SUPPLY

Award / contract ref: 20FB0136

Contractor

D

29 projects · ₱556.2M total · 0 flags

Other projects by this contractor

No sat.

CY 2024 BASIC EDUCATION FACILITIES FUND (BEFF) - CONSTRUCTION OF CLASSROOMS - CONSTRUCTION OF 2-STOREY 8-CLASSROOM AND 2 UNITS 4-STOREY 20-CLASSROOM SCHOOL BUILDINGS AT MARCIAL O. RAÑOLA MEMORIAL SCHOOL, GUINOBATAN, ALBAY

Albay 3rd DEO, Region V

2024₱145.4M
Past target date (DPWH On-Going)
No sat.

SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-MULTIPURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES- CONSTRUCTION OF MULTI PURPOSE TRAINING AND INSTRUCTIONAL FACILITY/MEETINGS INCENTIVES CONFERENCES FOR EDUCATION, SPORTS BUILDING

Albay 2nd DEO, Region V

2023₱70.3M
Past target date (DPWH On-Going)
No sat.

BIP - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF RIVER BANK PROTECTION WORKS AND DRAINAGE SYSTEM ALONG BARANGAY LACAG - BARANGAY KIDACO RIVER, DARAGA, ALBAY

Albay 2nd DEO, Region V

2024₱47.8M
Past target date (DPWH On-Going)
No sat.

SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS(SIPAG)-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF BARANGAY NAMANTAO ROAD WITH COMPLETE ROAD SAFETY FEATURES,DARAGA, ALBAY

Albay 2nd DEO, Region V

2024₱37.4M
Past target date (DPWH On-Going)
No sat.

BIP - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF RIVER BANK PROTECTION WORKS AND DRAINAGE SYSTEM ALONG BARANGAY PAWA - BARANGAY BOGTONG RIVER, LEGASPI CITY

Albay 2nd DEO, Region V

2024₱28.7M
Past target date (DPWH On-Going)
No sat.

CONCRETING OF BRGY. BASICAO INTERIOR-BRGY. AGOL FMR, PIODURAN, ALBAY

Albay 3rd DEO, Region V

2019₱24.9M
Reported complete (DPWH)
View all 29 projects →

4. Implementation

Contract Amount

₱6,912,850.00

Progress

Reported complete (DPWH)

Start Date

November 18, 2020

Target End

April 16, 2021

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region V (Bicol Region)AlbayCity of LegazpiBgy. 38 - Gogon
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
Drought / dry spell likelyPAGASA · 2026-10-07El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.