CONSTRUCTION/ MAINTENANCE OF FLOOD CONTROL MITIGATION STRUCTURES AND DRAINAGE SYSTEMS CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG CORONEL RIVER, CALABASA STA. 22+326.22 - STA. 22+515.22, GABALDON, NUEVA ECIJA
CONSTRUCTION/MAINTENANCE OF FLOOD CONTROL MITIGATION STRUCTURES AND DRAINAGE SYSTEMS CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG CORONEL RIVER, CALABASA STA. 22+326.22 - STA. 22+515.22, GABALDON, NUEVA ECIJA is a DPWH-tracked public work in Nueva Ecija 2nd DEO, Region III. Reported contract value: ₱7,883,329.38. Status: Reported complete (DPWH). Contractor on record: CCF EARTHMOVING CORP. Figures trace to dpwh.
DPWH did not publish coordinates for this project. Location estimated from the project title (barangay level); satellite images may not show the exact site.