Roads16PB0013No coordinates published by DPWH

ROAD UPGRADING (UNPAVED TO PAVED) BASED ON GRAVEL ROAD STRATEGIES, TRAFFIC BENCHMARK FOR UPGRADING TO PAVED ROAD STANDARDS (HDM-4 PROJECT ANALYSIS) K0615+060-K0615+485

ROAD UPGRADING (UNPAVED TO PAVED) BASED ON GRAVEL ROAD STRATEGIES, TRAFFIC BENCHMARK FOR UPGRADING TO PAVED ROAD STANDARDS (HDM-4 PROJECT ANALYSIS) K0615+060-K0615+485 is a DPWH-tracked public work in Apayao 1st DEO, Cordillera Administrative Region. Reported contract value: ₱16,659,963.43. Status: Reported complete (DPWH). Contractor on record: VUC HIGHLAND DEVELOPERS INC FORMERLY: VUC ENGINEERING. Figures trace to dpwh.

Apayao 1st DEO, Cordillera Administrative Region

DPWH did not publish coordinates for this project, so it cannot be placed on the map or checked with satellite images.

Region: Cordillera Administrative Region

No before/after satellite images: DPWH has not published map coordinates for this project, so there is no location to image.

Follow the peso

1 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2016 · ₱38,750 (shared by many projects, not this project's own line)

    Possible match · score 0.80

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-NCR-16-0037531 · ₱1,134,000 · release to the district office, not itemized per project

    Possible match · score 0.64

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 16PB0013 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · no satellite pair yet

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Unit-cost benchmark · Road, cost per km (new paving / upgrading)

₱39,199,914 per km= 1.0x the Cordillera Administrative Region median (n=103)

Contract cost ₱16,659,963 ÷ 0.425 km read from the DPWH title (“K0615+060-K0615+485”; K-post / station range length). National percentile: 77. Higher unit cost can have legitimate causes (terrain, design, scope not stated in the title); this is a comparison, not a finding. Methodology

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: ROAD UPGRADING (UNPAVED TO PAVED) BASED ON GRAVEL ROAD STRATEGIES, TRAFFIC BENCHMARK FOR UPGRADING TO PAVED ROAD STANDARDS (HDM-4 PROJECT ANALYSIS) K0615+060-K0615+485

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 80%

UACS
18001
Amount
₱38,750,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction / Rehabilitation of Nabuangan Flood Control Nabuangan, Apayao Lone District
GAA fiscal year
FY2016
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-NCR-16-0037531

₱1,134,000.00 · FY2016

Released to Sauyo High School (Pasong Tamo High School) To rele (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

C

24 projects · ₱1.0B total · 0 flags

Other projects by this contractor

No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM NETWORK DEVELOPMENT - PAVING OF UNPAVED ROADS (TERTIARY ROADS) CLAVERIA-CALANASAN-KABUGAO RD., K0682+074 - K0686+511

Cordillera Administrative Region, Cordillera Administrative Region

2018₱138.7M
Reported complete (DPWH)
No sat.

RD UPGRADING (UNPAVED TO PAVED) BASED ON GRAVEL RD STRATEGIES, TRAFFIC BENCHMARK FOR UPGRADING TO PAVED RD STDS (HDM-4 PROJ ANALYSIS) JUNCTION TALUBIN-BARLIG-NATONIN-PARACELIS-CALACCAD RD, K0457+218 - K0460+000

Cordillera Administrative Region, Cordillera Administrative Region

2016₱134.2M
Reported complete (DPWH)
No sat.

IMPROVEMENT OF MABACA TO TALOCTOC ROAD IN TANUDAN, KALINGA

Cordillera Administrative Region, Cordillera Administrative Region

2022₱130.3M
Reported complete (DPWH)
No sat.

NETWORK DEVELOPMENT - ROAD WIDENING - PRIMARY ROADS, KALINGA - CAGAYAN ROAD (CALANAN-ENRILE SECTION), K0510+427 - K0512+444 & K0512+469 -K0513+800, TABUK CITY, KALINGA

Lower Kalinga DEO, Cordillera Administrative Region

2019₱95.4M
Reported complete (DPWH)
No sat.

ROAD UPGRADING (UNPAVED TO PAVED) BASED ON GRAVEL ROAD STRATEGIES, TRAFFIC BENCHMARK FOR UPGRADING TO PAVED RD STDS (HDM-4 PROJ ANALYSIS) TABUK-BANAWE VIA TANUDAN-BARLIG RD, K0527+291-K0528+000, K0528+000-K0528+122,K0528+122-K0529+388,K0529+388-K0529+444,

Cordillera Administrative Region, Cordillera Administrative Region

2016₱75.9M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP) CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES (ROADS LEVERAGING LINKAGES FOR INDUSTRY AND TRADE INFRASTRUCTURE PROGRAM - ROLL-IT) MADUANG-DAGARA-MARAGAT-ABRA BOUND

Apayao 1st DEO, Cordillera Administrative Region

2024₱73.0M
Reported complete (100% progress, DPWH status On-Going)
View all 24 projects →

4. Implementation

Contract Amount

₱16,659,963.43

Progress

Reported complete (DPWH)

Start Date

March 29, 2016

Target End

January 22, 2017

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Cordillera Administrative Region (CAR)Apayao
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.