Flood Control and Drainage16GB0184No coordinates published by DPWH

CONSTRUCTION OF REVETMENT WALL AT SIBALOM RIVER ALONG ILOILO-ANTIQUE ROAD, STA. 0+000-STA. 0+395, B

CONSTRUCTION OF REVETMENT WALL AT SIBALOM RIVER ALONG ILOILO-ANTIQUE ROAD, STA. 0+000-STA. 0+395, B is a DPWH-tracked public work in Antique DEO, Region VI. Reported contract value: ₱13,693,126.52. Status: Reported complete (DPWH). Contractor on record: TIBIAO-ANTIQUE N K ENT INC. Figures trace to dpwh.

Antique DEO, Region VI

DPWH did not publish coordinates for this project. Location estimated from the project title (town level only); satellite images may not show the exact site.

Region: Region VI

No before/after satellite images: DPWH did not publish coordinates, and the location estimated from the project title is only town level, which is not confident enough to image.

Follow the peso

2 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2016 · ₱2,000 (shared by many projects, not this project's own line)

    Possible match · score 0.82

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-NCR-16-0026176 · ₱166,837 · release to the district office, not itemized per project

    Possible match · score 0.65

    DBM release source ↗
  3. 3. PhilGEPS award

    ₱13,693,127 · TIBIAO-ANTIQUE N K ENT INC

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · no satellite pair yet

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Unit-cost benchmark · Flood wall / dike / revetment, cost per linear meter (revetment)

₱34,666 per linear m= 0.3x the national median (n=191)

Contract cost ₱13,693,127 ÷ 395 linear m read from the DPWH title (“STA. 0+000-STA. 0+395”; station range length (Sta. a+b to c+d)). National percentile: 6. Higher unit cost can have legitimate causes (terrain, design, scope not stated in the title); this is a comparison, not a finding. Methodology

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF REVETMENT WALL AT SIBALOM RIVER ALONG ILOILO-ANTIQUE ROAD, STA.  0+000-STA. 0+395, B

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 82%

UACS
18001
Amount
₱2,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
New Construction of Flood Control (Slope Protection), Bulan bulan, San Remigio, Antique Lone District
GAA fiscal year
FY2016
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-NCR-16-0026176

₱166,837.00 · FY2016

Released to Technological University of the Philippines - Manil (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

4. Implementation

Contract Amount

₱13,693,126.52

Progress

Reported complete (DPWH)

Start Date

May 12, 2017

Target End

October 12, 2017

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region VI (Western Visayas)AntiqueSibalom
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.