Roads19PL0125

REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROAD ALONG MT. PROVINCE - BOUNDARY - CALANAN - PINUKPUK - ABBUT ROAD

REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROAD ALONG MT. PROVINCE - BOUNDARY - CALANAN - PINUKPUK - ABBUT ROAD is a DPWH-tracked public work in Lower Kalinga DEO, Cordillera Administrative Region. Reported contract value: ₱18,143,822.12. Status: Reported complete (DPWH). Contractor on record: UPLAND CONST AND ENGINEERING SERVICES. Figures trace to dpwh.

Lower Kalinga DEO, Cordillera Administrative Region
Region: Cordillera Administrative Region

Follow the peso

1 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    No GAA line found for this project's office and year. The GAA lists budgets by program and office, not always by project.

  2. 2. SARO / NCA release

    NCA NCA-ROIII-19-0011575 · ₱229,674 · release to the district office, not itemized per project

    Possible match · score 0.71

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 19PL0125 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2018-05-26 → 2023-03-21

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROAD ALONG MT. PROVINCE -  BOUNDARY - CALANAN - PINUKPUK - ABBUT ROAD

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

No matching GAA line found for this project in the FY2019 GAA. DBM GAA FY2019

2. Allotment

Office-level release, not tied to this specific contract

NCA NCA-ROIII-19-0011575

₱229,674.00 · FY2019

Released to al Wo Baler National High School (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM NCA listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

C

63 projects · ₱1.4B total · 0 flags

Other projects by this contractor

No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-CONSTRUCTION OF ROAD, PARACELIS ROXAS ROAD VIA (JCT. MABOLLOG-MABARUTBOT-CARUPAAN-TUPING-ANONAT PROPER SINAMAR SECTION), PARACELIS, MOUNTAIN PROVINCE

Mountain Province 2nd DEO, Cordillera Administrative Region

2025₱144.8M
Past target date (DPWH On-Going)

Construction of Buringal Proper Flood Control (Sulinek Section), Sta. 065+507 - Sta. 066+407 (Right Side), Buringal, Paracelis, Mountain Province

PARACELIS (MOUNTAIN PROVINCE), MOUNTAIN PROVINCE, Cordillera Administrative Region

2024₱96.5M
Reported complete (DPWH)

ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF ANONAT PROPER FLOOD CONTROL STRUCTURE (ILI SECTION), ST

Mountain Province 2nd DEO, Cordillera Administrative Region

2024₱96.5M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP) - CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP) - CASSAG-BACARRI-CAMPARADI-CAWAYAN-BURINGAL PROPER-SINAMAR ROAD LEADING TO SMO

Mountain Province 2nd DEO, Cordillera Administrative Region

2022₱96.5M
Reported complete (DPWH)
No sat.

Construction of Buringal Proper Flood Control, Sta. 065 + 267 - Sta. 065 + 867 (L.S.), Buringal, Paracelis, Mountain Province

PARACELIS (MOUNTAIN PROVINCE), MOUNTAIN PROVINCE, Cordillera Administrative Region

2023₱67.5M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM-CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES (ROADS LEVERAGING LINKAGES FOR INDUSTRY AND TRADE INFRASTRUCTURE PROGRAM-ROLL-IT) JCT. NANSUSO-BACARRI-BANTAHS-MPSPC-TAWANG R

Mountain Province 2nd DEO, Cordillera Administrative Region

2024₱57.9M
Reported complete (DPWH)
View all 63 projects →

4. Implementation

Contract Amount

₱18,143,822.12

Progress

Reported complete (DPWH)

Start Date

June 26, 2019

Target End

April 2, 2020

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Cordillera Administrative Region (CAR)KalingaCity of TabukBagumbayan
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
LandslideDetails in Hazard context above.Full hazard check →
El Niño outlook (province)
Dry conditions likelyPAGASA · 2026-10-07El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.