Buildings and Facilities16AC0094No coordinates published by DPWH

SOLID MANAGEMENT MATERIALS RECOVERY FACILITY, DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS, BANTAY, I. S.

SOLID MANAGEMENT MATERIALS RECOVERY FACILITY, DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS, BANTAY, I. S. is a DPWH-tracked public work in Ilocos Sur 1st DEO, Region I. Reported contract value: ₱151,772.56. Status: Reported complete (DPWH). Contractor on record: FIT CONST. Figures trace to dpwh.

Ilocos Sur 1st DEO, Region I

DPWH did not publish coordinates for this project. Location estimated from the project title (town level only); satellite images may not show the exact site.

Region: Region I

No before/after satellite images: DPWH did not publish coordinates, and the location estimated from the project title is only town level, which is not confident enough to image.

Follow the peso

2 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2016 · ₱25,000 (shared by many projects, not this project's own line)

    Possible match · score 0.82

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-BMB-C-16-0031959 · ₱3,207,492 · release to the district office, not itemized per project

    Possible match · score 0.62

    DBM release source ↗
  3. 3. PhilGEPS award

    ₱151,773 · FIT CONSTRUCTION

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · no satellite pair yet

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: SOLID MANAGEMENT MATERIALS RECOVERY FACILITY, DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS, BANTAY, I. S.

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 82%

UACS
18001
Amount
₱25,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of River Flood Control located at barangays Laoingen, Nambaran, Sto. Tomas, Quimmarayan and Nagbettedan, Sto. Domingo, Ilocos Sur 1st LD
GAA fiscal year
FY2016
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-BMB-C-16-0031959

₱3,207,492.00 · FY2016

Released to 000 - National Privacy Commission (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

Confirmed (exact contract ID) · 100%

Solid Management Materials

₱151,772.56 · FIT CONSTRUCTION

Award / contract ref: 16AC0094

Contractor

B

175 projects · ₱1.7B total · 0 flags

4. Implementation

Contract Amount

₱151,772.56

Progress

Reported complete (DPWH)

Start Date

December 4, 2016

Target End

December 13, 2016

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region I (Ilocos Region)Ilocos SurBantay
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
Flood (100-yr rain)Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.