Roads24KJ0096

REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - PRIMARY ROADS, OZAMIS - OROQUIETA RD - K1709+000 - K1711+000, K1717+589 - K1718+398

REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - PRIMARY ROADS, OZAMIS - OROQUIETA RD - K1709+000 - K1711+000, K1717+589 - K1718+398 is a DPWH-tracked public work in Misamis Occidental 2nd DEO, Region X. Reported contract value: ₱55,873,500.00. Status: Reported complete (DPWH). Contractor on record: SGM CONST. Figures trace to dpwh.

Misamis Occidental 2nd DEO, Region X
Region: Region X

Follow the peso

1 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2024 · ₱40,000 (shared by many projects, not this project's own line)

    Possible match · score 0.84

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 24KJ0096 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2022-01-31 → 2025-06-13

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Unit-cost benchmark · Road, cost per km (rehabilitation / reconstruction)

₱19,890,886 per km= 0.7x the Region X median (n=105)

Contract cost ₱55,873,500 ÷ 2.809 km read from the DPWH title (“K1709+000 - K1711+000; K1717+589 - K1718+398”; K-post / station range length). National percentile: 23. Higher unit cost can have legitimate causes (terrain, design, scope not stated in the title); this is a comparison, not a finding. Methodology

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - PRIMARY ROADS, OZAMIS - OROQUIETA RD - K1709+000 - K1711+000, K1717+589 - K1718+398

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 84%

UACS
18001
Amount
₱40,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control along Mobod Creek ( Proper Langcangan - Lower Lamac - Upper Loboc - Canubay - Mobod ) , Oroquieta City, Misamis Occidental
GAA fiscal year
FY2024
DBM GAA source document

2. Allotment

Agency-level releases for FY2024, not tied to this contract

Misamis Occidental 2nd DEO · SARO 1,917 (₱267,033,855,698.00) · NCA 1,287 (₱846,238,484,493.07)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

D

95 projects · ₱1.2B total · 0 flags

Other projects by this contractor

No sat.

ROAD WIDENING - PRIMARY ROADS, OZAMIS - PAGADIAN RD - K1672+640 - K1674+000

Misamis Occidental 2nd DEO, Region X

2024₱55.9M
Reported complete (DPWH)
No sat.

ROAD WIDENING - PRIMARY ROADS, OZAMIS - OROQUIETA RD - K1707+535 - K1708+200, K1715+968 - K1717+402.500

Misamis Occidental 2nd DEO, Region X

2024₱55.9M
Past target date (DPWH On-Going)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF BARANGAY MACALIBRE ALTO, BAR

Misamis Occidental 1st DEO, Region X

2024₱53.2M
Past target date (DPWH On-Going)
No sat.

FLOOD MANAGEMENT PROGRAM - CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL ALONG PINES RIVER, ALORAN AND OROQUIETA CITY, MISAMIS OCCIDENTAL.

Misamis Occidental 1st DEO, Region X

2025₱48.3M
Past target date (DPWH On-Going)
No sat.

FLOOD MANAGEMENT PROGRAM - CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL ALONG ALORAN RIVER, ALORAN, MISAMIS OCCIDENTAL

Misamis Occidental 1st DEO, Region X

2025₱48.3M
Past target date (DPWH On-Going)
No sat.

FLOOD MANAGEMENT PROGRAM - CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL ALONG PAYPAYAN BRIDGE, OROQUIETA CITY, MISAMIS OCCIDENTAL.

Misamis Occidental 1st DEO, Region X

2025₱48.3M
Past target date (DPWH On-Going)
View all 95 projects →

4. Implementation

Contract Amount

₱55,873,500.00

Progress

Reported complete (DPWH)

Start Date

May 23, 2024

Target End

March 14, 2025

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region X (Northern Mindanao)Misamis OccidentalTudelaNailon
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
Flood (100-yr rain)Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.