SGM CONST is listed as a company organization in Philippine public procurement records on this site, with 95 linked DPWH project(s) totaling about ₱1,209,350,323.19. Recorded delivery grade D (pattern summary from public DPWH/PhilGEPS links — not a finding of wrongdoing).
SGM CONST
DRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 95
- Total value
- ₱1,209,350,323.19
- Published flags
- 0
- Region
- Misamis Occidental 1st DEO · Region X
Online presence
Google Maps: SGM Construction Crushing PlantGoogle Maps, 2026-10-22
N/A, Tangub City, 7214 Misamis Occidental
Licensed officers (PCAB)
- Kim Howell Roma Seclot · Authorized Managing Officer (PCAB license 38805) PCAB online license verification, 2026-10-22
Authorized Managing Officer as listed on the PCAB public licence register. The AMO is not necessarily an owner of the firm. Right of reply: contractors and named officers may request corrections.
Public Record Grade
A transparent, data-derived summary of reported public records for SGM CONST — not an accusation or finding of wrongdoing.
Score: 69.80 / 100 · Projects in sample: 95 · As of Oct 22, 2026 UTC
Thin public record coverage: several grade components had no data and were reweighted. Treat the letter grade as directional, not definitive.
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 43/100 · Weight: 53%
- graceDays
- 30
- componentScore
- 43
- lateCompletedProjects
- 50
- onTimeCompletedProjects
- 24
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 94
- pastTargetOngoingProjects
- 20
- undatedCompletedProjectsExcluded
- 1
- Termination rate
Component score: 100/100 · Weight: 24%
- totalProjects
- 95
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 24%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 95
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 95
- componentScore
- —
- flagsPerProject
- 0
- publishedV2Flags
- 0
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 95
- componentScore
- —
- linkedObservations
- 0
Computed automatically from public DPWH, PhilGEPS and COA records, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
Showing 49 of 90 geotagged projects (largest by contract value) — Open full map
- REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - PRIMARY ROADS, OZAMIS - OROQUIETA RD - K1709+000 - K1711+000, K1717+589 - K1718+39824KJ0096 · ₱55,873,500.00 · mapped
- ROAD WIDENING - PRIMARY ROADS, OZAMIS - PAGADIAN RD - K1672+640 - K1674+00024KJ0097 · ₱55,873,500.00 · mapped
- ROAD WIDENING - PRIMARY ROADS, OZAMIS - OROQUIETA RD - K1707+535 - K1708+200, K1715+968 - K1717+402.50024KJ0098 · ₱55,873,499.98 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF BARANGAY MACALIBRE ALTO, BAR24KI0064 · ₱53,158,279.50 · mapped
- FLOOD MANAGEMENT PROGRAM - CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL ALONG PINES RIVER, ALORAN AND OROQUIETA CITY, MISAMIS OCCIDENTAL.25KI0003 · ₱48,265,000.00 · mapped
- FLOOD MANAGEMENT PROGRAM - CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL ALONG ALORAN RIVER, ALORAN, MISAMIS OCCIDENTAL25KI0007 · ₱48,265,000.00 · mapped
- FLOOD MANAGEMENT PROGRAM - CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL ALONG PAYPAYAN BRIDGE, OROQUIETA CITY, MISAMIS OCCIDENTAL.25KI0001 · ₱48,264,850.46 · mapped
- ASSET PRESERVATION PROGRAM - REHABILITATION / RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS - OROQUIETA CITY - CALAMBA MT. RD - K1748+070 - K1748+14225KI0009 · ₱47,912,583.51 · mapped
- CONSTRUCTION OF BYPASS AND DIVERSION ROADS, PANGUIL BAY ACCESS ROAD (SILANGA-SAN APOLINARIO SECTION), MISAMIS OCCIDENTAL24KJ0018 · ₱47,529,998.53 · mapped
- CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, PANGUIL BAY ACCESS ROAD (TANGUB - BONIFACIO SECTION), MISAMIS OCCIDENTAL24KJ0104 · ₱47,285,011.07 · mapped
- CONSTRUCTION (COMPLETION) OF MISAMIS OCCIDENTAL 1ST DISTRICT ENGINEERING OFFICE BUILDING, LOWER LAMAC, OROQUIETA CITY, MISAMIS OCCIDENTAL (PHASE 2)25KI0021 · ₱46,730,501.26 · mapped
- CONSTRUCTION OF MISAMIS OCCIDENTAL 1ST DISTRICT ENGINEERING OFFICE BUILDING, LOWER LAMAC, OROQUIETA CITY, MISAMIS OCCIDENTAL24KI0063 · ₱38,599,996.35 · mapped
- CONSTRUCTION (COMPLETION) OF MISAMIS OCCIDENTAL 1ST DISTRICT ENGINEERING OFFICE BUILDING, LOWER LAMAC, OROQUIETA CITY.25KI0022 · ₱38,214,000.00 · mapped
- SIPAG- ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES CONSTRUCTION OF ROAD, BARANGAY LINABO, POLANCO, ZAMBOANGA DEL NORTE25JB0037 · ₱31,985,520.00 · mapped
- NETWORK DEVELOPMENT PROGRAM - ROAD WIDENING - SECONDARY ROADS OROQUIETA CITY - CALAMBA MT. RD. - K1754+989.5 - K1755+462; K1755+573 - K1755+87424KI0038 · ₱29,883,139.02 · mapped
- ASSET PRESERVATION PROGRAM - REHABILITATION / RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS - OROQUIETA CITY - CALAMBA MT. RD - K1771+264 - K1771+42525KI0006 · ₱29,252,999.63 · mapped
- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS - SIPAG - ACCESS ROADS AND/OR BRIDGES FROM NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ROAD, BARANGAY DICOLOC TO BARANGAY SIBAROC, JIMENEZ, MISAMIS OCCIDENTA25KI0053 · ₱29,106,000.00 · mapped
- CONSTRUCTION OF 3-STOREY 9-CL (SCIENCE LAB, ICT LAB, REGULAR WORKSHOPS,REGULAR CLASSROOMS) SCHOOL BUILDING AT TALAIRON NHS (304057), OROQUIETA CITY, MISAMIS OCCIDENTAL18KI0111 · ₱28,683,530.92 · mapped
- BASIC INFRASTRUCTURE PROGRAM - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF ROAD FROM BARANGAY USOCAN TO BARANGAY BATO, PLARIDEL, MISAMIS OCCIDENTAL25KI0020 · ₱24,007,500.01 · mapped
- CONSTRUCTION OF 2STY6CL, VICTOR ENERIO MES, OROQUIETA CITY, MISAMIS OCCIDENTAL.24KI0089 · ₱21,400,655.30 · mapped
- BIP- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES CONSTRUCTION OF SPILLWAY BARANGAY BAAO, DAPITAN CITY, ZAMBOANGA DEL NORTE24JB0044 · ₱19,749,847.84 · mapped
- ASSET PRESERVATION PROGRAM - REHABILITATION / RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS - OROQUIETA CITY - CALAMBA MT. RD - K1747+914 - K1747+93325KI0004 · ₱19,502,000.02 · mapped
- BASIC INFRASTRUCTURE PROGRAM - BIP - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ROAD, BARANGAY LOOC PROPER, PLARIDEL, MISAMIS OCCIDENTAL.24KI0031 · ₱17,819,973.37 · mapped
- CONSTRUCTION OF FLOOD CONTROL ALONG LAYAWAN RIVER, OROQUIETA CITY, MISAMIS OCCIDENTAL.21KI0081 · ₱17,148,801.54 · mapped
- CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO SEAPORT ACCESS ROAD FROM NATIONAL HIGHWAY LEADING TO SAN VICENTE BAJO PORT OROQUIETA CITY, MISAMIS OCCIDENTAL19KI0019 · ₱15,209,596.34 · mapped
- FLOOD MANAGEMENT PROGRAM CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF PROTECTION DIKE, PINES CIS, OROQUIETA CITY, MISAMIS OCCIDENTAL25KI0014 · ₱14,259,000.01 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM -SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - INTERJURISDICTIONAL ROADS AND/OR BRIDGES (OR, ROADS THAT TRAVERSE MULTIPLE LGU JURISDICTION) - CONSTRUCTION OF PLARIDEL BY-PASS ROAD, LOOC PROPER - MA24KI0058 · ₱14,258,999.47 · mapped
- COMPLETION OF MULTI-PURPOSE BUILDING, PANAON, MISAMIS OCCIDENTAL.25KI0046 · ₱11,761,200.00 · mapped
- CONSTRUCTION OF ROAD AND IMPROVEMENTS FROM BARANGAY SENOTE TO BARANGAY CLARIN ROAD SETTLEMENT, OROQUIETA CITY, MISAMIS OCCIDENTAL.23KI0111 · ₱11,579,888.37 · mapped
- ASSET PRESERVATION - CONSTRUCTION / UPGRADING / REHABILITATION OF DRAINAGE ALONG NATIONALROADS - PRIMARY ROADS - OROQUIETA CITY - PLARIDEL - CALAMBA - SAPANG DALAGA RD. - K1785+402 - K1785+800; K1789+000 - K1789+263; K1789+706 - K1790+00023KI0083 · ₱11,365,512.38 · mapped
- Construction of Jimenez CIS Protection Dike, Jimenez, Misamis Occidental24KI0001 · ₱9,799,878.80 · mapped
- CONSTRUCTION OF SOLAR WATER SYSTEM, BRGY. BINUANGAN TIPAN, OROQUIETA CITY, MISAMIS OCCIDENTAL.23KI0099 · ₱9,604,000.65 · mapped
- RECONSTRUCTION/REHABILITATION OF USUGAN RIVER FLOOD CONTROL STRUCTURE, BRGY. USUGAN, BONIFACIO, MISAMIS OCCIDENTAL23KJ0105 · ₱9,455,040.88 · mapped
- RECONSTRUCTION/REHABILITATION OF SLOPE PROTECTION ALONG OZAMIZ-PAGADIAN ROAD, K1667+500, BRGY. DIGSON, BONIFACIO, MISAMIS OCCIDENTAL23KJ0107 · ₱9,312,761.17 · mapped
- CONSTRUCTION OF 1STY3CL WITH ATTACHED TOILET, SAPANG DALAGA CENTRAL ELEMENTARY SCHOOL,SAPANG DALAGA, MISAMIS OCCIDENTAL.23KI0105 · ₱8,998,918.49 · mapped
- BASIC INFRASTRUCTURE PROGRAM - BIP - ACCESS ROADS AND/OR BRIDGES FROM NATIONAL ROAD/SCONSTRUCTION OF ROAD, BARANGAY POBLACION, SAPANG DALAGA, MISAMIS OCCIDENTAL.24KI0036 · ₱6,929,995.51 · mapped
- CONSTRUCTION OF 1STY2CL WITH ATTACHED TOILET, MALIBACSAN ELEMENTARY SCHOOL, JIMENEZ, MISAMIS OCCIDENTAL.23KI0103 · ₱6,790,000.06 · mapped
- CONSTRUCTION OF 1STY2CL PANALSALAN INTEGRATED SCHOOL, PLARIDEL, MISAMIS OCCIDENTAL23KI0104 · ₱6,789,926.46 · mapped
- CONSTRUCTION OF 1-STOREY 2-CLASSROOM SCHOOL BUILDING IN BRGY. PALILAN ELEMENTARY SCHOOL, BRGY. PALILAN, JIMENEZ, MISAMIS OCCIDENTAL.24KI0073 · ₱6,756,050.01 · mapped
- REHABILITATION OF MULTI-PURPOSE BUILDING, BARANGAY NORTHERN POBLACION, BALIANGAO MISAMIS OCCIDENTAL.24KI0005 · ₱6,722,099.99 · mapped
- CONST./UPGRADING/REHAB. OF DRAINAGE ALONG NATIONAL ROADS, OZAMIZ CITY - OROQUIETA CITY ROAD, K1733+926 - K1734+038; K1739+180 - K1739+400; K1739+675 - K1740+02618KI0005 · ₱6,189,046.87 · mapped
- CONSTRUCTION OF 1 - STOREY 2CL (WITH TOILET ATTACHED) SCHOOL BUILDING AT MASUBONG PS(127527), SAPANG DALAGA, MISAMIS OCCIDENTAL.22KI0091 · ₱5,890,625.55 · mapped
- CONSTRUCTION OF 1 STOREY 5CL SCHOOL BUILDING AT PELONG ES, ALORAN, MISAMIS OCCIDENTAL17KI0091 · ₱5,712,579.19 · mapped
- BIP- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES CONSTRUCTION OF SLOPE PROTECTION STRUCTURE WEST POBLACION, RIZAL, ZAMBOANGA DEL NORTE24JB0049 · ₱4,929,999.98 · mapped
- CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES (ROADS LEVERAGING LINKAGES FOR INDUSTRY AND TRADE INFRASTRUCTURE PROGRAM-ROLL-IT) BARANGAY DAMPALAN-PRINCESA LAMAYA ROAD, CONNECTING SAN JUAN AND MABUHAY IN SUPPORT25JB0007 · ₱4,890,000.00 · mapped
- CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES (ROADS LEVERAGING LINKAGES FOR INDUSTRY AND TRADE INFRASTRUCTURE PROGRAM-ROLL-IT) BARANGAY SAN JUAN-DAMPALAN-SAN ISIDRO ROAD CONNECTING NATIONAL ROAD AND MARAPONG IN25JB0008 · ₱4,889,999.99 · mapped
- CONSTRUCTION OF 1 STOREY 4 CLASSROOM SCHOOL BLDG. AT DULLAN IS, OROQUIETA CITY17KI0090 · ₱4,863,417.43 · mapped
- BRIDGE PROGRAM - REHABILITATION / MAJOR REPAIR OF PERMANENT BRIDGES - PINES BR. (B00367MN) ALONG OZAMIS CITY-OROQUIETA CITY.25KI0030 · ₱4,850,999.98 · mapped
- CONCRETING OF BRGY. DAPACAN BAJO FMR, BRGY. DAPACAN BAJO, CALAMBA, MISAMIS OCCIDENTAL.19KI0194 · ₱4,815,657.86 · mapped
- CONST. OF 1-STOREY 3-CL SCHOOL BUILDING AT BITIBUT IS, SAPANG DALAGA, MISAMIS OCCIDENTAL17KI0097 · ₱3,749,936.38
Across government
No DepEd or DOH contract awards matched to this name in PhilGEPS records loaded so far.
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
