Buildings and Facilities17CL0155No coordinates published by DPWH

PACKAGE 2- A. CONSTRUCTION OF 2 STOREY, 6 CLASSROOM SCHOOL BUILDING AT GAMA ELEMENTARY SCHOOL, STA. CRUZ, ZAMBALES; B. CONSTRUCTION OF 2 STOREY, 6 CLASSROOM SCHOOL BUILDING AT MALABAGO ELEMENTARY SCHOOL, STA. CRUZ, ZAMBALES

PACKAGE 2- A. CONSTRUCTION OF 2 STOREY, 6 CLASSROOM SCHOOL BUILDING AT GAMA ELEMENTARY SCHOOL, STA. CRUZ, ZAMBALES; B. CONSTRUCTION OF 2 STOREY, 6 CLASSROOM SCHOOL BUILDING AT MALABAGO ELEMENTARY SCHOOL, STA. CRUZ, ZAMBALES is a DPWH-tracked public work in Zambales 1st DEO, Region III. Reported contract value: ₱40,006,106.69. Status: Reported complete (DPWH). Contractor on record: GOLDRICH CONST. Figures trace to dpwh.

Zambales 1st DEO, Region III

DPWH did not publish coordinates for this project. Location estimated from the project title (barangay level); satellite images may not show the exact site.

Region: Region III

Follow the peso

1 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2017 · ₱15,000 (shared by many projects, not this project's own line)

    Possible match · score 0.83

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-ROXI-17-0022649 · ₱7,844 · release to the district office, not itemized per project

    Possible match · score 0.58

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 17CL0155 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2017-06-15 → 2024-02-16

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: PACKAGE 2- A. CONSTRUCTION OF 2 STOREY, 6 CLASSROOM SCHOOL BUILDING AT GAMA ELEMENTARY SCHOOL, STA. CRUZ, ZAMBALES; B. CONSTRUCTION OF 2 STOREY, 6 CLASSROOM SCHOOL BUILDING AT MALABAGO ELEMENTARY SCHOOL, STA. CRUZ, ZAMBALES

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 83%

UACS
18001
Amount
₱15,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Slope Protection/ Flood Control, Lipay River Control, Sta. Cruz, Zambales
GAA fiscal year
FY2017
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-ROXI-17-0022649

₱7,844.00 · FY2017

Released to Pablo Lorenzo National High School (Mandug National High School) (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

122 projects · ₱6.1B total · 0 flags

Other projects by this contractor

No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM NETWORK DEVELOPMENT - PAVING OF UNPAVED ROADS (TERTIARY ROADS) CLAVERIA-CALANASAN-KABUGAO RD., K0678+899 - K0682+045

Cordillera Administrative Region, Cordillera Administrative Region

2018₱159.8M
Reported complete (DPWH)
No sat.

CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES, POBLACION-PUGUIL-TUBADAY ROAD, CONNECTING BALAOAN-SANTOL ROAD IN SUPPORT TO SOFT BROOM INDUSTRY AND OTHER HIGH VALUE AGRICULTURAL PRODUCTS, SANTOL, LA UNION

Region I, Region I

2018₱144.7M
Reported complete (DPWH)
No sat.

CONTRACT PACKAGE 1: CONST/REH OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS CONST. OF FLOOD MITIGATION FACILITIES ALONG A. BALILI RIVER (MAIN) STA. 1+297-STA. 1+400 B. ASIN-GALLANO RIVER STA. 2+240-STA. 2+788

Baguio City DEO, Cordillera Administrative Region

2025₱139.8M
Past target date (DPWH On-Going)
No sat.

CONTRACT PACKAGE 1: A. PREVENTIVE MAINTENANCE -SECONDARY ROADS: 1. ASIN RD. K0305+(-535), K0305+000-K0306+541, (S04722LZ) CHAINAGE 000-CHAINAGE 1552. LOAKAN RD. K0249+875-K0250+096, K0250+380-K0250+842 3. MAGSAYSAY AVE (TRINIDAD RD) - (S00522LZ) CHAINAGE

Baguio City DEO, Cordillera Administrative Region

2023₱138.1M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF MISSING LINKS/NEW ROADS BAGUIO - LA TRINIDAD - ITOGON - SABLAN - TUBA AND TUBLAY, KAMOG JCT. - CALOT - PAPPA - BAGONG - BALLUAY - TUEL

Cordillera Administrative Region, Cordillera Administrative Region

2020₱133.0M
Reported complete (DPWH)
No sat.

CONTRACT PACKAGE 6: REH/RECONST. OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE: A. SECONDARY ROADS: 1. PMA RD. K0249+480-K0249+598 B. TERTIARY ROADS: 1. EASTERNLINK CIRCUM RD. K0247+930-K0247+980 2. PMA CUT-OFF RD. 3- (S05054LZ): CH. 1600 - CH. 1700

Baguio City DEO, Cordillera Administrative Region

2024₱124.7M
Reported complete (DPWH)
View all 122 projects →

4. Implementation

Contract Amount

₱40,006,106.69

Progress

Reported complete (DPWH)

Start Date

January 8, 2018

Target End

June 6, 2018

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region III (Central Luzon)ZambalesSanta Cruz
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.