Buildings and Facilities16PF0030

CONSTRUCTION OF PAOAY BARANGAY HEALTH STATION

CONSTRUCTION OF PAOAY BARANGAY HEALTH STATION is a DPWH-tracked public work in Benguet 2nd DEO, Cordillera Administrative Region. Reported contract value: ₱992,000.02. Status: Reported complete (DPWH). Contractor on record: CABUGUIASAN BUILDERS. Figures trace to dpwh.

Benguet 2nd DEO, Cordillera Administrative Region
Region: Cordillera Administrative Region

Follow the peso

2 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2016 · ₱25,000 (shared by many projects, not this project's own line)

    Possible match · score 0.82

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-ROVIII-16-0004244 · ₱697,000 · release to the district office, not itemized per project

    Possible match · score 0.61

    DBM release source ↗
  3. 3. PhilGEPS award

    ₱992,000 · CABUGUIASAN BUILDERS

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · imagery 2016-11-23 → 2023-02-10

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF PAOAY BARANGAY HEALTH STATION

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 82%

UACS
18001
Amount
₱25,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Loo Flood Control along Agno River, Loo, Buguias, Benguet
GAA fiscal year
FY2016
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-ROVIII-16-0004244

₱697,000.00 · FY2016

Released to 00008 - Regional Office - VIII (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

Confirmed (exact contract ID) · 100%

16PF0030 paoay barangay health station

₱992,000.02 · CABUGUIASAN BUILDERS

Award / contract ref: 16PF0030

Possible match · 83%

Construction of Bitnong Farm-to-Market Road

₱1,949,649.00 · CABUGUIASAN BUILDERS

Contractor

B

16 projects · ₱416.3M total · 0 flags

Other projects by this contractor

No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM 1: CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS - NRJ-NATUBLENG-NABALICONG-CABUGUIASAN-PACSO-TONGLO-SACLALAN ROAD LEADING TO VARIOUS TOURIST ATTRACTIONS

Cordillera Administrative Region, Cordillera Administrative Region

2018₱162.8M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM CONSTRUCTION OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS: NRJ NATUBLENG-NABALICONG-CABUGUIASAN-PACSO-TONGLO-SACLALAN ROAD LEADING TO VARIOUS TOURIST ATTRACTIONS, BUGUIAS, BENGUET

Benguet 2nd DEO, Cordillera Administrative Region

2020₱56.0M
Reported complete (DPWH)
No sat.

Construction of Flood Control Structure at Nabalicong, Natubleng, Buguias, Benguet

BUGUIAS (BENGUET), BENGUET, Cordillera Administrative Region

2022₱49.0M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM ACCESS ROAD LEADING TO DECLARED TOURIST DESTINATION NRJ-NATUBLENG-NABALICONG-CABUGUIASAN-PACSO-TONGLO-SACLALAN ROAD LEADING TO VARIOUS TOURIST ATTRACTIONS

Benguet 2nd DEO, Cordillera Administrative Region

2019₱29.2M
Reported complete (DPWH)
No sat.

Construction of Flood Mitigation Structure within Agno River Basin: along Agno River Main Stream (Mangkew-Nabneng, LS), Kabayan, Benguet

KABAYAN (BENGUET), BENGUET, Cordillera Administrative Region

2022₱24.4M
Reported complete (DPWH)
No sat.

Construction of Flood Mitigation Structure within Agno River Basin: along Agno River Main Stream (Pacso Section), Kabayan, Benguet

KABAYAN (BENGUET), BENGUET, Cordillera Administrative Region

2022₱24.4M
Reported complete (DPWH)
View all 16 projects →

4. Implementation

Contract Amount

₱992,000.02

Progress

Reported complete (DPWH)

Start Date

December 27, 2016

Target End

February 9, 2017

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Cordillera Administrative Region (CAR)BenguetAtokPaoay
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
Flood (100-yr rain)Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.