Buildings and Facilities18FO0116

PARTIAL CONSTRUCTION OF CLASSROOMS (2-STOREY 4-CLASSROOM SCHOOL BUILDING, 2 SCIENCE WORKSHOP) AT MALAPAY HIGH SCHOOL, PIODURAN, ALBAY (9.50M X 23.00M)

PARTIAL CONSTRUCTION OF CLASSROOMS (2-STOREY 4-CLASSROOM SCHOOL BUILDING, 2 SCIENCE WORKSHOP) AT MALAPAY HIGH SCHOOL, PIODURAN, ALBAY (9.50M X 23.00M) is a DPWH-tracked public work in Albay 3rd DEO, Region V. Reported contract value: ₱10,783,209.57. Status: Reported complete (DPWH). Contractor on record: CAMSUR BICOL TRADING INC. Figures trace to dpwh.

Albay 3rd DEO, Region V
Region: Region V

Follow the peso

2 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2018 · ₱13,000 (shared by many projects, not this project's own line)

    Possible match · score 0.82

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-ROXI-18-0014897 · ₱761,214 · release to the district office, not itemized per project

    Possible match · score 0.74

    DBM release source ↗
  3. 3. PhilGEPS award

    ₱10,783,210 · CAMSUR BICOL TRADING INC

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · imagery 2012-12-01 → 2012-12-01

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: PARTIAL CONSTRUCTION OF CLASSROOMS (2-STOREY 4-CLASSROOM SCHOOL BUILDING, 2 SCIENCE WORKSHOP) AT MALAPAY HIGH SCHOOL, PIODURAN, ALBAY (9.50M X 23.00M)

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 82%

UACS
18001
Amount
₱13,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Guinobatan Flood Control Structure, Tandarora Section, Guinobatan, Albay
GAA fiscal year
FY2018
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-ROXI-18-0014897

₱761,214.00 · FY2018

Released to Division of Davao Oriental (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

Confirmed (exact contract ID) · 100%

18FO0116

₱10,783,209.57 · CAMSUR BICOL TRADING INC

Award / contract ref: 18FO0116

Contractor

D

17 projects · ₱102.2M total · 1 flags

Other projects by this contractor

No sat.

CONSTRUCTION OF ROAD, FROM BARANGAY MAMLAD TO BARANGAY LAWINON, PIO DURAN, ALBAY

Albay 3rd DEO, Region V

2021₱19.6M
Reported complete (DPWH)
No sat.

PARTIAL CONSTRUCTION OF CLASSROOMS (2-STOREY 6-CLASSROOM SCHOOL BUILDING, 2 REGULAR WORKSHOP, 2 SHS CLASSROOMS) AT MARIGONDON NATIONAL HIGH SCHOOL, PIODURAN, ALBAY (9.50M X 32.00M)

Albay 3rd DEO, Region V

2018₱12.3M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP)-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES- CONSTRUCTION OF ROAD, BARANGAY MAMLAD, PIO DURAN, ALBAY

Albay 3rd DEO, Region V

2024₱5.0M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), BARANGAY ORINGON, PIO DURAN, ALBAY

Albay 3rd DEO, Region V

2024₱5.0M
Reported complete (DPWH)
No sat.

BASIC INFRASTRUCTURE PROGRAM - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONCRETING OF ROAD, BARANGAY FLORES, PIODURAN, ALBAY

Albay 3rd DEO, Region V

2023₱5.0M
Past target date (DPWH On-Going)
No sat.

CY 2024 BASIC EDUCATION FACILITIES FUND (BEFF) - CONSTRUCTION OF CLASSROOMS - CONSTRUCTION OF 1-STOREY 2-CLASSROOM SCHOOL BUILDING IN ESTRELLA ELEMENTARY SCHOOL, BARANGAY ESTRELLA, JOVELLAR, ALBAY

Albay 3rd DEO, Region V

2024₱4.8M
Past target date (DPWH On-Going)
View all 17 projects →

4. Implementation

Contract Amount

₱10,783,209.57

Progress

Reported complete (DPWH)

Start Date

December 27, 2018

Target End

June 27, 2019

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Cite this record

Love the Philippines. “PARTIAL CONSTRUCTION OF CLASSROOMS (2-STOREY 4-CLASSROOM SCHOOL BUILDING, 2 SCIENCE WORKSHOP) AT MALAPAY HIGH SCHOOL, PIODURAN, ALBAY (9.50M X 23.00M).” Source: DPWH. Data as of October 21, 2026. https://lovethephilippines.com/projects/4f73205c-866f-41e1-aa15-bac560312720

The official source record is authoritative. An indicator on this site is not a finding of wrongdoing.

Connected records

Where this project sits

Place (PSGC)
Region V (Bicol Region)AlbayPio DuranMalapay
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
Drought / dry spell likelyPAGASA · 2026-11-03El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.