Roads24DK0138

OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADS - MAUBAN - TIGNOAN RD - K0159+000-K0159+130, K0160+230-K0160+320, K0162+868-K0163+030

OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADS - MAUBAN - TIGNOAN RD - K0159+000-K0159+130, K0160+230-K0160+320, K0162+868-K0163+030 is a DPWH-tracked public work in Quezon 1st DEO, Region IV-A. Reported contract value: ₱9,799,481.59. Status: Reported complete (DPWH). Contractor on record: ANDAMAN BUILDERS. Figures trace to dpwh.

Quezon 1st DEO, Region IV-A
Region: Region IV-A

Follow the peso

1 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2024 · ₱8,000 (shared by many projects, not this project's own line)

    Possible match · score 0.80

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 24DK0138 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2020-09-28 → 2020-09-28

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Unit-cost benchmark · Road, cost per km (rehabilitation / reconstruction)

₱25,653,093 per km= 0.8x the Region IV-A median (n=150)

Contract cost ₱9,799,482 ÷ 0.382 km read from the DPWH title (“K0159+000-K0159+130; K0160+230-K0160+320; K0162+868-K0163+030”; K-post / station range length). National percentile: 42. Higher unit cost can have legitimate causes (terrain, design, scope not stated in the title); this is a comparison, not a finding. Methodology

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADS - MAUBAN - TIGNOAN RD - K0159+000-K0159+130, K0160+230-K0160+320, K0162+868-K0163+030

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 80%

UACS
18001
Amount
₱8,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Structures, Brgy. Libjo, Infanta, Quezon
GAA fiscal year
FY2024
DBM GAA source document

2. Allotment

Agency-level releases for FY2024, not tied to this contract

Quezon 1st DEO · SARO 1,917 (₱267,033,855,698.00) · NCA 1,287 (₱846,238,484,493.07)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

C

38 projects · ₱273.2M total · 0 flags

Other projects by this contractor

No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - BIP - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF LUCBAN RICE WAREHOUSE BUILDING, BRGY. KULAPI, LUCBAN, QUEZON

Quezon 1st DEO, Region IV-A

2024₱29.7M
Past target date (DPWH On-Going)
No sat.

CSSP - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF LANGUYIN-POBLACION ROAD, POLILLO, QUEZON

Quezon 1st DEO, Region IV-A

2024₱29.4M
Reported complete (DPWH)
No sat.

OO2:PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MNGT. PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ALITAO RIVER, BARANGAY WAKAS, TAYABAS CITY, QUEZON

Quezon 1st DEO, Region IV-A

2025₱29.1M
Past target date (DPWH On-Going)
No sat.

CSSP - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - SIPAG - ACCESS ROADS ... - CONSTRUCTION OF ROAD AT BARANGAY ALUYON - BARANGAY MABINI, BURDEOS, QUEZON

Quezon 1st DEO, Region IV-A

2024₱24.5M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SPECIAL ROAD FUND - MOTOR VEHICLE USERS CHARGE (MVUC) AS PER R.A. 11239 - REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS ALONG MSR DIVERSION RD - (S05869LZ) CHAINAGE 0 - CHAINAGE 240

Quezon 1st DEO, Region IV-A

2024₱13.4M
Reported complete (DPWH)
No sat.

CONCRETING OF BRGY. LIWAYWAY FMR PHASE II, BRGY. LIWAYWAY, MAUBAN, QUEZON

Quezon 1st DEO, Region IV-A

2024₱9.9M
Reported complete (100% progress, DPWH status On-Going)
View all 38 projects →

4. Implementation

Contract Amount

₱9,799,481.59

Progress

Reported complete (DPWH)

Start Date

July 31, 2024

Target End

October 26, 2024

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region IV-A (CALABARZON)QuezonMaubanCagsiay I
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.