Roads15IG0211

REHAB./RECONST. OF NAT'L. ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE ALONG BATO-BONTOC ROAD K1110+250-K1110+300,K1111+480-K1111+730,K1111+900-K1112+050,K1113+500-K1113+900,K1114+178-K1114+203,K1115+850-K1116+000,K1116+100-K1116+400,K1118+000-K1118+150

REHAB./RECONST. OF NAT'L. ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE ALONG BATO-BONTOC ROAD K1110+250-K1110+300,K1111+480-K1111+730,K1111+900-K1112+050,K1113+500-K1113+900,K1114+178-K1114+203,K1115+850-K1116+000,K1116+100-K1116+400,K1118+000-K1118+150 is a DPWH-tracked public work in Leyte 5th DEO, Region VIII. Reported contract value: ₱44,805,847.64. Status: Reported complete (DPWH). Contractor on record: LADY OF ASSUMPTION ENT INC FORMERLY: LADY OF ASSUMPTION ENT. Figures trace to dpwh.

Leyte 5th DEO, Region VIII
Region: Region VIII

Follow the peso

2 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2016 · ₱40,000 (shared by many projects, not this project's own line)

    Possible match · score 0.80

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-ROVI-16-0037057 · ₱185,000 · release to the district office, not itemized per project

    Possible match · score 0.66

    DBM release source ↗
  3. 3. PhilGEPS award

    ₱44,805,600 · LADY OF ASSUMPTION ENTERPRISES

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · imagery 2014-11-07 → 2014-11-07

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: REHAB./RECONST. OF NAT'L. ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE ALONG BATO-BONTOC ROAD K1110+250-K1110+300,K1111+480-K1111+730,K1111+900-K1112+050,K1113+500-K1113+900,K1114+178-K1114+203,K1115+850-K1116+000,K1116+100-K1116+400,K1118+000-K1118+150

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 80%

UACS
18001
Amount
₱40,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Structure along Salog River, Hilongos Proper, Hilongos Leyte 5th LD
GAA fiscal year
FY2016
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-ROVI-16-0037057

₱185,000.00 · FY2016

Released to Don Esteban S. Javellana National High School Re (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

Confirmed (exact contract ID) · 100%

Rehabilitation/Reconstruction of National Roads

₱44,805,600.00 · LADY OF ASSUMPTION ENTERPRISES

Award / contract ref: 15IG0211(Re-advertise)

Contractor

B

77 projects · ₱2.9B total · 0 flags

Other projects by this contractor

No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE FACILITY (SPORTS COMPLEX), TAM-IS, MAASIN CITY, SOUTHERN L

Southern Leyte 1st DEO, Region VIII

2022₱241.1M
Reported complete (100% progress, DPWH status On-Going)

CONSTRUCTION OF STORM SURGE PROTECTION: HEIGHTENED ROAD AND TIDE EMBANKMENT, STATION 5+640 - STATION 6+080, SECTION 5 PHASE 13, BRGY. CALOGCOG, TANAUAN, LEYTE

Region VIII, Region VIII

2018₱147.8M
Reported complete (DPWH)
No sat.

CONSTRUCTION/IMPROVEMENT OF ACCESS ROAD LEADING TO DECLARED TOURISM DESTINATIONS, JCT. ABUYOG - SILAGO ROAD - CADAC-AN - MALAGUICAY ROAD LEADING TO MALAGUICAY FALLS, ABUYOG, LEYTE 5TH LD

Region VIII, Region VIII

2018₱139.9M
Reported complete (DPWH)
No sat.

CONSTRUCTION IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS JCT. ABUYOG - SILAGO ROAD - CADAC-AN - MALAGUICAY ROAD LEADING TO MALAGUICAY FALLS, ABUYOG, LEYTE

Region VIII, Region VIII

2020₱120.6M
Reported complete (DPWH)
No sat.

ASSET PRESERVATION - PREVENTIVE MAINTENANCE - SECONDARY ROADS, JCT. HIMAY-ANGAN - SILAGO - ABUYOG BDRY. RD. - K1063+000 - K1068+601, SOUTHERN LEYTE

Region VIII, Region VIII

2020₱97.0M
Reported complete (DPWH)
No sat.

ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS - BDRY SOUTHERN LEYTE - MAASIN - MACROHON - SOGOD - JCT. DAANG MAHARLIKA - K1124+(-925) - K1125+581

Southern Leyte 1st DEO, Region VIII

2024₱96.5M
Reported complete (100% progress, DPWH status On-Going)
View all 77 projects →

4. Implementation

Contract Amount

₱44,805,847.64

Progress

Reported complete (DPWH)

Start Date

March 11, 2016

Target End

October 27, 2016

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region VIII (Eastern Visayas)LeyteBatoTagaytay
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
Drought / dry spell likelyPAGASA · 2026-10-07El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.