CONST/ MAINT OF FLOOD MITIGATION STRUC & DRAINAGE SYSTEM, SABO/FC PROJS ALONG LAOAG RIVER BASIN & PRINCIPAL RIVERS, TRIBUTARIES-CONST OF FC STRUC ALONG LADING RIVER, BRGY. BARANGUBONG, NUEVA ERA, I.N.
CONST/MAINT OF FLOOD MITIGATION STRUC & DRAINAGE SYSTEM, SABO/FC PROJS ALONG LAOAG RIVER BASIN & PRINCIPAL RIVERS, TRIBUTARIES-CONST OF FC STRUC ALONG LADING RIVER, BRGY. BARANGUBONG, NUEVA ERA, I.N. is a DPWH-tracked public work in Ilocos Norte 2nd DEO, Region I. Reported contract value: ₱19,599,992.16. Status: Reported complete (DPWH). Contractor on record: GACUTAN CONST INC FORMERLY: GACUTAN CONST. Figures trace to dpwh.
DPWH did not publish coordinates for this project, so it cannot be placed on the map or checked with satellite images.
No before/after satellite images: DPWH has not published map coordinates for this project, so there is no location to image.
Total Contract Cost