Roads20GP0044

PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - ALONG JCT. NAT'L RD - JAMINDAN-LINAMBASAN-CAMP V PERALTA RD (S00465PN) K0108+110 - K0109+145

PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - ALONG JCT. NAT'L RD - JAMINDAN-LINAMBASAN-CAMP V PERALTA RD (S00465PN) K0108+110 - K0109+145 is a DPWH-tracked public work in Capiz 2nd DEO, Region VI. Reported contract value: ₱10,157,686.91. Status: Reported complete (DPWH). Contractor on record: MJBL CONST SERVICES. Figures trace to dpwh.

Capiz 2nd DEO, Region VI
Region: Region VI

Follow the peso

1 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2020 · ₱30,000 (shared by many projects, not this project's own line)

    Possible match · score 0.80

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 20GP0044 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2010-05-22 → 2025-07-28

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Unit-cost benchmark · Road, cost per km (preventive maintenance / overlay)

₱9,814,190 per km= 0.6x the Region VI median (n=221)

Contract cost ₱10,157,687 ÷ 1.035 km read from the DPWH title (“K0108+110 - K0109+145”; K-post / station range length). National percentile: 12. Higher unit cost can have legitimate causes (terrain, design, scope not stated in the title); this is a comparison, not a finding. Methodology

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - ALONG JCT. NAT'L RD - JAMINDAN-LINAMBASAN-CAMP V PERALTA RD (S00465PN) K0108+110 - K0109+145

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 80%

UACS
18001
Amount
₱30,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of River Control/Flood Control along Panay River Phase I, Panay, Capiz
GAA fiscal year
FY2020
DBM GAA source document

2. Allotment

Agency-level releases for FY2020, not tied to this contract

Capiz 2nd DEO · SARO 1,970 (₱160,521,624,356.00) · NCA 998 (₱407,918,568,220.27)

3. Procurement & Award

4. Implementation

Contract Amount

₱10,157,686.91

Progress

Reported complete (DPWH)

Start Date

November 27, 2020

Target End

March 7, 2021

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region VI (Western Visayas)CapizJamindanLinambasan
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
Dry conditions likelyPAGASA · 2026-10-07El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.