Roads18I00008

ASSET PRESERVATION OF NAT'L. ROADS-PREVENTIVE MAINT. BASED ON PAVEMENT MGT. SYSTEM/HIGHWAY DEV'T. & MGT.-4 (HDM-4), PRIMARY ROADS BILIRAN CIRCUMFERENTIAL ROAD-K1025+450-K1025+738,K1034+225-K1035+050,K1072+000-K1073+000,K1095+000-K1097+000,K1098...,BILIRAN

ASSET PRESERVATION OF NAT'L. ROADS-PREVENTIVE MAINT. BASED ON PAVEMENT MGT. SYSTEM/HIGHWAY DEV'T. & MGT.-4 (HDM-4), PRIMARY ROADS BILIRAN CIRCUMFERENTIAL ROAD-K1025+450-K1025+738,K1034+225-K1035+050,K1072+000-K1073+000,K1095+000-K1097+000,K1098...,BILIRAN is a DPWH-tracked public work in Region VIII, Region VIII. Reported contract value: ₱49,695,879.60. Status: Reported complete (DPWH). Contractor on record: YAKAL CONST. Figures trace to dpwh.

Region VIII, Region VIII
Region: Region VIII

Follow the peso

1 of 5 steps linked to this project. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    No GAA line found for this project's office and year. The GAA lists budgets by program and office, not always by project.

  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 18I00008 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2016-03-28 → 2025-11-17

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: ASSET PRESERVATION OF NAT'L. ROADS-PREVENTIVE MAINT. BASED ON PAVEMENT MGT. SYSTEM/HIGHWAY DEV'T. & MGT.-4 (HDM-4), PRIMARY ROADS BILIRAN CIRCUMFERENTIAL ROAD-K1025+450-K1025+738,K1034+225-K1035+050,K1072+000-K1073+000,K1095+000-K1097+000,K1098...,BILIRAN

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

No matching GAA line found for this project in the FY2018 GAA. DBM GAA FY2018

2. Allotment

No matching SARO/NCA release found for this project. Source: DBM SARO/NCA listings.

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

C

59 projects · ₱4.1B total · 0 flags

Other projects by this contractor

No sat.

ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS - JCT. MILAGROS - BALENO - LAGTA RD. (S00016MT) - K0025+(-115) - K0030+140, MILAGROS, MASBATE

Masbate 2nd DEO, Region V

2022₱285.0M
Reported complete (100% progress, DPWH status On-Going)
No sat.

ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS - JCT. MILAGROS - BALENO - LAGTA RD. (S00016MT) - K0042+682 - K0045+725, MANDAON, MASBATE

Masbate 2nd DEO, Region V

2022₱172.7M
Past target date (DPWH On-Going)
No sat.

OO1:ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM (MFO-1)NATIONAL DEVELOPMENT-CONSTRUCTION OF MISSING LINKS/NEW ROADS, ASID-TIGBAO-BARA-MALBUG ROAD, INCLUDING ROW, MASBATE PROVINCE

Region V, Region V

2018₱172.6M
Reported complete (DPWH)
No sat.

ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS - JCT. TAWAD - BALUD RD. (S00023MT) - K0028+(-360) - K0028+944, K0029+910 - K0031+930, MILAGROS, MASBATE

Masbate 2nd DEO, Region V

2022₱158.2M
Past target date (DPWH On-Going)
No sat.

WIDENING ALONG BILIRAN CIR. ROAD, K1010+490-K1011+488; K1024+034-K1025+202; K1057+200-K1058+912; K1057+200-K1058+912; K1064+000-K1064+716; K1066+162-K1066+162-K1067+000; K1108+609, BILIRAN, NAVAL, KAWAYAN, CULABA & CABUCGAYAN, BILIRAN LONE DISTRICT ...,

Biliran DEO, Region VIII

2017₱156.2M
Reported complete (DPWH)
No sat.

ROAD WIDENING OF NAVAL - CAIBIRAN CROSS COUNTRY ROAD- K1027+890-K1028+210, K1028+268-K1028+770, K1033+738-K1033+980, K1033+1020-K1034+700, K1036+000-K1036+530, K1036+570-K1037+190, K1037+192-K1037+708, K1044+483.5-K1045+536, BILIRAN DISTRICT

Region VIII, Region VIII

2018₱140.1M
Past target date (DPWH On-Going)
View all 59 projects →

4. Implementation

Contract Amount

₱49,695,879.60

Progress

Reported complete (DPWH)

Start Date

February 12, 2018

Target End

December 8, 2018

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region VIII (Eastern Visayas)BiliranNavalPadre Inocentes Garcia
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.