Buildings and Facilities17DK0087No coordinates published by DPWH

CONSTRUCTION OF ONE(1) STOREY THREE(3) CLASSROOM SCHOOL BLDG @ PAARALANG ELEMENTARYA NG LUCBAN 2 PEL II-A & PEL II-B, LUCBAN, QUEZON

CONSTRUCTION OF ONE(1) STOREY THREE(3) CLASSROOM SCHOOL BLDG @ PAARALANG ELEMENTARYA NG LUCBAN 2 PEL II-A & PEL II-B, LUCBAN, QUEZON is a DPWH-tracked public work in Quezon 1st DEO, Region IV-A. Reported contract value: ₱4,325,524.86. Status: Reported complete (DPWH). Contractor on record: LUCBAN BUILDERS AND CONST SUPPLY INCORPORAT. Figures trace to dpwh.

Quezon 1st DEO, Region IV-A

DPWH did not publish coordinates for this project, so it cannot be placed on the map or checked with satellite images.

Region: Region IV-A

No before/after satellite images: DPWH has not published map coordinates for this project, so there is no location to image.

Follow the peso

1 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2017 · ₱10,000 (shared by many projects, not this project's own line)

    Possible match · score 0.82

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-BMB-E-17-0021010 · ₱300,000,000 · release to the district office, not itemized per project

    Possible match · score 0.61

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 17DK0087 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · no satellite pair yet

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Unit-cost benchmark · School building, cost per classroom (new school building)

₱1,441,842 per classroom= 0.7x the Region IV-A median (n=665)

Contract cost ₱4,325,525 ÷ 3 classroom read from the DPWH title (“THREE(3) CLASSROOM”; classroom count in title). National percentile: 36. Higher unit cost can have legitimate causes (terrain, design, scope not stated in the title); this is a comparison, not a finding. Methodology

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION  OF ONE(1) STOREY THREE(3) CLASSROOM SCHOOL BLDG @ PAARALANG ELEMENTARYA NG LUCBAN 2  PEL II-A & PEL II-B, LUCBAN, QUEZON

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 82%

UACS
18001
Amount
₱10,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control, Barangay Aliliw, Lucban, Quezon
GAA fiscal year
FY2017
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-BMB-E-17-0021010

₱300,000,000.00 · FY2017

Released to Regional Field Unit - V (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

50 projects · ₱640.3M total · 0 flags

Other projects by this contractor

No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - MAUBAN BY-PASS ROAD, PACKAGE A, QUEZON

Quezon 1st DEO, Region IV-A

2022₱77.2M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - MAUBAN BYPASS ROAD, QUEZON

Quezon 1st DEO, Region IV-A

2025₱70.8M
Past target date (DPWH On-Going)
No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - MAUBAN BYPASS ROAD, QUEZON

Quezon 1st DEO, Region IV-A

2024₱49.0M
Reported complete (DPWH)
No sat.

NETWORK DEV'T-CONST OF BYPASS/DIVERSION ROADS INCLUDNG ROW BYPASS ROAD MAUBAN SIDE, QUEZON PROVINCE

Quezon 1st DEO, Region IV-A

2017₱40.9M
Reported complete (DPWH)
No sat.

LOCAL PROGRAM NATIONAL BUILDING PROGRAM BUILDINGS AND OTHER STRUCTURES MULTIPURPOSE/FACILITIES CONSTRUCTION (COMPLETION) OF EXISTING BUILDING, DPWH QUEZON 1ST DISTRICT ENGINEERING OFFICE BRGY. KULAPI (FORMER COLAPI), LUCBAN, QUEZON

Quezon 1st DEO, Region IV-A

2021₱34.3M
Reported complete (DPWH)
No sat.

OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADS - LUCENA-TAYABAS-LUCBAN-SAMPALOC-MAUBAN PORT RD - K0144 + 630 - K0145 + 947

Quezon 1st DEO, Region IV-A

2025₱32.2M
Past target date (DPWH On-Going)
View all 50 projects →

4. Implementation

Contract Amount

₱4,325,524.86

Progress

Reported complete (DPWH)

Start Date

October 9, 2017

Target End

March 12, 2018

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region IV-A (CALABARZON)Quezon
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
Dry conditions likelyPAGASA · 2026-10-07El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.