Buildings and Facilities20FO0105

CONSTRUCTION OF MULTI-PURPOSE BUILDING (ALS BUILDING), SAN PEDRO STREET, BRGY. ZONE 3, POBLACION, LIBON, ALBAY

CONSTRUCTION OF MULTI-PURPOSE BUILDING (ALS BUILDING), SAN PEDRO STREET, BRGY. ZONE 3, POBLACION, LIBON, ALBAY is a DPWH-tracked public work in Albay 3rd DEO, Region V. Reported contract value: ₱9,119,702.34. Status: Past target date (DPWH On-Going). Contractor on record: QDC CONST AND SUPPLY. Figures trace to dpwh.

Albay 3rd DEO, Region V
Region: Region V

Follow the peso

1 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2020 · ₱18,000 (shared by many projects, not this project's own line)

    Possible match · score 0.84

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 20FO0105 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    97% reported · imagery 2019-12-29 → 2025-05-31

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF MULTI-PURPOSE BUILDING (ALS BUILDING), SAN PEDRO STREET, BRGY. ZONE 3, POBLACION, LIBON, ALBAY

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 84%

UACS
18001
Amount
₱18,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of San Franciso River Flood Control Structure, Guinobatan, Albay
GAA fiscal year
FY2020
DBM GAA source document

2. Allotment

Agency-level releases for FY2020, not tied to this contract

Albay 3rd DEO · SARO 1,970 (₱160,521,624,356.00) · NCA 998 (₱407,918,568,220.27)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

50 projects · ₱417.1M total · 0 flags

Other projects by this contractor

No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SPECIAL ROAD FUND-MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239 - PREVENTIVE MAINTENANCE -PRIMARY ROADS - MAHARLIKA HIGHWAY - K0524+188-K0524+481, K0526+000-K0526+522, DARAGA, ALBAY (2ND LEGISLATIVE DISTRICT)

Region V, Region V

2025₱29.0M
Past target date (DPWH On-Going)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SPECIAL ROAD FUND-MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239-PREVENTIVE MAINTENANCE-PRIMARY ROADS-MAHARLIKA HIGHWAY-K0528+460-K0528+771, K0539+000-K0539+285.5, DARAGA, ALBAY (2ND LEGISLATIVE DISTRICT)

Region V, Region V

2025₱27.6M
Past target date (DPWH On-Going)
No sat.

CLUSTER 28-CONSTRUCTION OF RURAL HEALTH UNITS(RHU) AND BARANGAY HEALTH STATION (BHS) IN BACACAY AND MALILIPOT, ALBAY

Albay 1st DEO, Region V

2018₱22.1M
Reported complete (DPWH)
No sat.

LOCAL PROGRAM: NATIONAL BUILDING PROGRAM - BUILDINGS AND OTHER STRUCTURES - MULTIPURPOSE / FACILITIES - CONSTRUCTION OF MULTI-PURPOSE BUILDING AT COAST GUARD OF THE PHILIPPINES, REGIONAL SITE CENTER, RAWIS, LEGAZPI CITY

Albay 2nd DEO, Region V

2024₱19.0M
Past target date (DPWH On-Going)
No sat.

OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION PROGRAM- PREVENTIVE MAINTENANCE-TERTIARY ROADS- COMUN-INARADO-PENAFRANCIA RD - K0522 + 000 - K0523 + 000

Albay 2nd DEO, Region V

2025₱18.1M
Past target date (DPWH On-Going)
No sat.

CONSTRUCTION/CONCRETING OF IRRIGATION SERVICE ROADS IN CAVASI-TINAMPO (LIGAO CITY SECTION) - BONGORAN-OBALIW RINAS (OAS ALBAY SECTION), OAS, ALBAY

Albay 3rd DEO, Region V

2020₱15.6M
Past target date (DPWH On-Going)
View all 50 projects →

4. Implementation

Contract Amount

₱9,119,702.34

Progress

Past target date (DPWH On-Going)

Start Date

December 17, 2020

Target End

June 29, 2021

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region V (Bicol Region)AlbayLibonZone III
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
Flood (100-yr rain)Details in Hazard context above.Full hazard check →
El Niño outlook (province)
Drought / dry spell likelyPAGASA · 2026-11-03El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.