Buildings and Facilities23BH0204

CONSTRUCTION OF 1 STOREY 2 CLASSROOM WITH TOILET, JONES WEST CENTRAL SCHOOL CAMPUS 2 JONES, ISABELA

CONSTRUCTION OF 1 STOREY 2 CLASSROOM WITH TOILET, JONES WEST CENTRAL SCHOOL CAMPUS 2 JONES, ISABELA is a DPWH-tracked public work in Isabela 4th DEO, Region II. Reported contract value: ₱4,977,249.53. Status: Reported complete (DPWH). Contractor on record: G B CARLOS CONST. Figures trace to dpwh.

Isabela 4th DEO, Region II
Region: Region II

Follow the peso

1 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2023 · ₱50,000 (shared by many projects, not this project's own line)

    Possible match · score 0.83

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 23BH0204 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2021-05-16 → 2025-06-03

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Unit-cost benchmark · School building, cost per classroom (new school building)

₱2,488,625 per classroom= 1.9x the Region II median (n=370)

Contract cost ₱4,977,250 ÷ 2 classroom read from the DPWH title (“2 CLASSROOM”; classroom count in title). National percentile: 81. Higher unit cost can have legitimate causes (terrain, design, scope not stated in the title); this is a comparison, not a finding. Methodology

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF 1 STOREY 2 CLASSROOM WITH TOILET, JONES WEST CENTRAL SCHOOL CAMPUS 2 JONES, ISABELA

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 83%

UACS
18001
Amount
₱50,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Dicamay1 Flood Control Structure Section 1 Jones, Isabela
GAA fiscal year
FY2023
DBM GAA source document

2. Allotment

Agency-level releases for FY2023, not tied to this contract

Isabela 4th DEO · SARO 16 (₱22,616,681,592.00) · NCA 0 (₱0.00)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

C

48 projects · ₱161.5M total · 0 flags

Other projects by this contractor

No sat.

ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - REHABILITATION AT CAPPIDDIGAN CREEK, MAGAT RIVER IRRIGATION SYSTEM, SA

Isabela 4th DEO, Region II

2025₱14.3M
Past target date (DPWH On-Going)
No sat.

BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS / FACILITIES TO SUPPORT SOCIAL SERVICES - REHABILITATION OF MUNICIPAL HALL, BRGY. SAN FABIAN, ECHAGUE, ISABELA

Isabela 4th DEO, Region II

2024₱9.8M
Reported complete (100% progress, DPWH status On-Going)
No sat.

BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDING/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY SALAY, SAN AGUSTIN, ISABELA

Isabela 4th DEO, Region II

2024₱5.0M
Reported complete (DPWH)
No sat.

BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI - PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI - PURPOSE BUILDING, CAPIRPIRIWAN ELEMENTARY SCHOOL, BARANGAY CAPIRPIRIWAN, CORDON, ISABELA

Isabela 4th DEO, Region II

2023₱4.9M
Reported complete (DPWH)
No sat.

CONSTRUCTION OF MULTI PURPOSE BUILDING, DAY CARE CENTER, BARANGAY BARUYEN, BANGUI, ILOCOS NORTE

Ilocos Norte 1st DEO, Region I

2024₱4.9M
Past target date (DPWH On-Going)
No sat.

BASIC INFRASTRUCTURE PROGRAM - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF ROAD, BARANGAY PAPAN WESTE,JONES, ISABELA

Isabela 4th DEO, Region II

2023₱4.9M
Reported complete (DPWH)
View all 48 projects →

4. Implementation

Contract Amount

₱4,977,249.53

Progress

Reported complete (DPWH)

Start Date

August 10, 2023

Target End

December 14, 2023

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Cite this record

Love the Philippines. “CONSTRUCTION OF 1 STOREY 2 CLASSROOM WITH TOILET, JONES WEST CENTRAL SCHOOL CAMPUS 2 JONES, ISABELA.” Source: DPWH. Data as of October 21, 2026. https://lovethephilippines.com/projects/53661a3f-f0f6-4d9b-93ac-f3f652842e4a

The official source record is authoritative. An indicator on this site is not a finding of wrongdoing.

Connected records

Where this project sits

Place (PSGC)
Region II (Cagayan Valley)IsabelaJonesBarangay II
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.