Roads15GA0210No coordinates published by DPWH

CONCRETING OF BRGY. GUINBALIWAN NEW WASHINGTON FMR, BRGY. GUINBALIWAN, NEW WASHINGTON, AKLAN

CONCRETING OF BRGY. GUINBALIWAN NEW WASHINGTON FMR, BRGY. GUINBALIWAN, NEW WASHINGTON, AKLAN is a DPWH-tracked public work in Aklan DEO, Region VI. Reported contract value: ₱1,922,838.72. Status: Reported complete (DPWH). Contractor on record: KENBE CONST. Figures trace to dpwh.

Aklan DEO, Region VI

DPWH did not publish coordinates for this project. Location estimated from the project title (barangay level); satellite images may not show the exact site.

Region: Region VI

Follow the peso

1 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    No GAA line found for this project's office and year. The GAA lists budgets by program and office, not always by project.

  2. 2. SARO / NCA release

    SARO SARO-NCR-16-0013736 · ₱13,590,143 · release to the district office, not itemized per project

    Possible match · score 0.65

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 15GA0210 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2015-04-29 → 2025-07-28

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONCRETING OF BRGY. GUINBALIWAN NEW WASHINGTON FMR, BRGY. GUINBALIWAN, NEW WASHINGTON, AKLAN

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

No matching GAA line found for this project in the FY2016 GAA. DBM GAA FY2016

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-NCR-16-0013736

₱13,590,143.00 · FY2016

Released to P0400001 - Technological University of the Philippines - Manil (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

A

479 projects · ₱2.2B total · 0 flags

4. Implementation

Contract Amount

₱1,922,838.72

Progress

Reported complete (DPWH)

Start Date

May 30, 2016

Target End

August 4, 2016

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region VI (Western Visayas)AklanNew Washington
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.