Roads21IG0013

ASSET PRESERVATION - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS - BATO - BONTOC RD. - K1113+830-K1114+225, K1116+700-K1116+800, K1117+270-K1117+440

ASSET PRESERVATION - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS - BATO - BONTOC RD. - K1113+830-K1114+225, K1116+700-K1116+800, K1117+270-K1117+440 is a DPWH-tracked public work in Leyte 5th DEO, Region VIII. Reported contract value: ₱15,083,376.00. Status: Past target date (DPWH On-Going). Contractor on record: JONATHAN B BAUTISTA ENT. Figures trace to dpwh.

Leyte 5th DEO, Region VIII
Region: Region VIII

Follow the peso

1 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2021 · ₱30,000 (shared by many projects, not this project's own line)

    Possible match · score 0.79

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 21IG0013 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    0% reported · imagery 2014-11-07 → 2022-08-16

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: ASSET PRESERVATION - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS - BATO - BONTOC RD. - K1113+830-K1114+225, K1116+700-K1116+800, K1117+270-K1117+440

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 79%

UACS
18001
Amount
₱30,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Bito Flood Control Structure, Barangay Odion, Javier, Leyte
GAA fiscal year
FY2021
DBM GAA source document

2. Allotment

Agency-level releases for FY2021, not tied to this contract

Leyte 5th DEO · SARO 1,294 (₱130,951,870,166.00) · NCA 1,353 (₱701,960,015,999.00)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

C

11 projects · ₱101.3M total · 0 flags

Other projects by this contractor

No sat.

CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES/ICHON-SINDANGAN-GUINABONAN-MANINGNING ROAD CONNECTING TO SC GLOBAL MANUFACTURER, SOGOD BAY COCO ACTIVE CARBON AND KENNEMER FOODS INTERNATIONAL, MACROHON AND MALITB

Southern Leyte 1st DEO, Region VIII

2019₱20.6M
Reported complete (DPWH)
No sat.

CONCRETING OF BARANGAY ROAD FROM BARANGAY BULI TO BARANGAY IMELDA, BATO, LEYTE

Leyte 5th DEO, Region VIII

2020₱14.6M
Reported complete (DPWH)
No sat.

CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS, ACCESS ROAD LEADING TO FATIMA HILLS, ICHON, MACROHON, SOUTHERN LEYTE

Southern Leyte 1st DEO, Region VIII

2020₱11.5M
Reported complete (DPWH)
No sat.

LOCAL INFRASTRUCTURE PROGRAM - LOCAL ROADS AND BRIDGES - LOCAL ROADS, CONSTRUCTION OF ICHON - SINDANGAN ROAD (BYPASS), BARANGAYS ICHON AND SINDANGAN, MACROHON, SOUTHERN LEYTE

Southern Leyte 1st DEO, Region VIII

2019₱9.9M
Reported complete (DPWH)
No sat.

CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES AND INDUSTRIES AND ECONOMIC ZONES ICHON - SINDANGAN - GUINABONAN - MANINGNING ROAD CONNECTING TO SC GLOBAL MANUFACTURER, SOGOD BAY COCO ACTIVE CARBON AND KENNEMER FOODS INTERNATIONAL, MALITBOG, SO

Southern Leyte 1st DEO, Region VIII

2021₱9.3M
Past target date (DPWH On-Going)
No sat.

CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. STO. NIÑO, BRGY. TAGAYTAY, BRGY. SAN JUAN, BRGY. UPPER MAHAPLAG, BRGY. POBLACION, MAHAPLAG, LEYTE

Leyte 5th DEO, Region VIII

2020₱6.7M
Reported complete (DPWH)
View all 11 projects →

4. Implementation

Contract Amount

₱15,083,376.00

Progress

Past target date (DPWH On-Going)

Start Date

August 4, 2021

Target End

February 26, 2022

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region VIII (Eastern Visayas)LeyteBatoAnahawan
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
Flood (100-yr rain)Details in Hazard context above.Full hazard check →
El Niño outlook (province)
Drought / dry spell likelyPAGASA · 2026-10-07El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.