Buildings and Facilities22AA0155

CONSTRUCTION OF EVACUATION CENTER, BARANGAY BURAYOC, PAGUDPUD, ILOCOS NORTE

CONSTRUCTION OF EVACUATION CENTER, BARANGAY BURAYOC, PAGUDPUD, ILOCOS NORTE is a DPWH-tracked public work in Ilocos Norte 1st DEO, Region I. Reported contract value: ₱4,842,435.03. Status: Reported complete (DPWH). Contractor on record: RCJR CONST. Figures trace to dpwh.

Ilocos Norte 1st DEO, Region I
Region: Region I

Follow the peso

3 of 5 steps linked to this project. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2022 · ₱25,000

    Probable match · score 0.86

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    ₱4,403,461 · RCJR CONSTRUCTION

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · imagery 2021-11-05 → 2024-12-21

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF EVACUATION CENTER, BARANGAY BURAYOC, PAGUDPUD, ILOCOS NORTE

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 86%

UACS
18001
Amount
₱25,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Structure at Barangay 18,17,14,13,10,9,8,7,3,2 Bacarra, Ilocos Norte
GAA fiscal year
FY2022
DBM GAA source document

2. Allotment

Agency-level releases for FY2022, not tied to this contract

Ilocos Norte 1st DEO · SARO 1,577 (₱362,967,860,598.00) · NCA 828 (₱622,683,863,078.47)

3. Procurement & Award

Confirmed (exact contract ID) · 100%

22AA0155

₱4,403,460.95 · RCJR CONSTRUCTION

Award / contract ref: 22AA0155

Contractor

B

15 projects · ₱67.2M total · 0 flags

Other projects by this contractor

No sat.

CONCRETING OF BRGY. BURAYOC TO BRGY. SUBEC FMR, BRGY. BURAYOC AND BRGY. SUBEC, PAGUDPUD, ILOCOS NORTE

Ilocos Norte 1st DEO, Region I

2021₱9.8M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM- CONSTRUCTION/ IMPROVEMENT OF ACCES ROADS LEADING TO SEAPORTS (KALSADA TUNGO SA PALIPARAN, RILES, AT DAUNGAN PROGRAM - KATUPARAN); MAYAN TO VALANGA PORT NATIONAL ROAD, ITBAYAT, BATANES

Batanes DEO, Region II

2023₱9.8M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP): CONSTRUCTION/IMPROVEMENT OF ACCESS RAODS LEADING TO SEAPORTS (KALSADA TUNGO SA PALIPARAN, RILES AT DAUNGAN PROGRAM - KATUPARAN); ACCESS ROAD LEADING TO TACHIMUS PORT, ITBAYAT, BATANES

Batanes DEO, Region II

2023₱9.8M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP); CONSTRUCTION / IMPROVEMENT OF ACCESS ROADS LEADING TO SEAPORTS (KALSADA TUNGO SA PALIPARAN, RILES, AT DAUNGAN PROGRAM - KATUPARAN); ACCESS ROAD LEADING TO MAUYEN PORT, ITBAYAT, BATANES

Batanes DEO, Region II

2023₱9.8M
Reported complete (DPWH)
No sat.

CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS, MAOINI-BADUANG-SAUD-CAPARISPISAN-BALAOI ROAD, PAGUDPUD, ILOCOS NORTE

Ilocos Norte 1st DEO, Region I

2022₱3.9M
Reported complete (DPWH)
No sat.

CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES, NAMBARAN-PULANGI-PANINAAN ROAD CONNECTING THE MANILA NORTH ROAD IN SUPPORT TO THE WINE AND FRUIT JUICE MAKING INDUSTRY, BRGY. 23, PANINAAN, BACARRA, ILOCOS NORTE

Ilocos Norte 1st DEO, Region I

2022₱3.5M
Reported complete (DPWH)
View all 15 projects →

4. Implementation

Contract Amount

₱4,842,435.03

Progress

Reported complete (DPWH)

Start Date

April 4, 2022

Target End

January 8, 2023

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region I (Ilocos Region)Ilocos NortePagudpudBurayoc
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
Flood (100-yr rain)Storm surgeDetails in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.