Roads18PI0037

CONC/IMPVT/REHAB/UPGR OF DALICAN FMR PHASE II, DALICAN, BONTOC

CONC/IMPVT/REHAB/UPGR OF DALICAN FMR PHASE II, DALICAN, BONTOC is a DPWH-tracked public work in Mountain Province 1st DEO, Cordillera Administrative Region. Reported contract value: ₱4,820,243.38. Status: Reported complete (DPWH). Contractor on record: SADLAN CONST. Figures trace to dpwh.

Mountain Province 1st DEO, Cordillera Administrative Region
Region: Cordillera Administrative Region

Follow the peso

1 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2018 · ₱7,500 (shared by many projects, not this project's own line)

    Possible match · score 0.82

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-BMB-D-18-0005195 · ₱229,772 · release to the district office, not itemized per project

    Possible match · score 0.72

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 18PI0037 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2016-11-23 → 2023-07-09

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONC/IMPVT/REHAB/UPGR OF DALICAN FMR PHASE II, DALICAN, BONTOC

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 82%

UACS
18001
Amount
₱7,500,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction/Rehabilitation of Upper Calacaban Flood Control, Calacaban, Tadian, Mt. Province
GAA fiscal year
FY2018
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-BMB-D-18-0005195

₱229,772.00 · FY2018

Released to Central Office (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

40 projects · ₱254.4M total · 0 flags

Other projects by this contractor

No sat.

NATIONAL DISASTER RISK REDUCTION AND MANAGEMENT FUND (CALAMITY FUND) - RECONSTRUCTION, REHABILITATION, REPAIR, AID, RELIEF AND OTHER WORKS OR SERVICES, INCLUDING PRE-DISASTER ACITVITIES: IMPLEMENTATION OF VARIOUS FLOOD CONTROL PROJECTS IN MOUNTAIN PROVIN

Mountain Province 1st DEO, Cordillera Administrative Region

2017₱43.6M
Reported complete (DPWH)
No sat.

Construction of Wawang Flood Control Structure, Sta. 32 + 180 - Sta. 32 + 250 (L.S.), Sta. 32 + 184 - Sta. 32 + 264 (R.S.), Sta. 32 + 328 - Sta. 32 + 358 (L.S.), Sta. 32 + 335 - Sta. 32 + 375 (R.S.) along Talubin River, Bontoc, Mountain Province

BONTOC (CAPITAL) (MOUNTAIN PROVINCE), MOUNTAIN PROVINCE, Cordillera Administrative Region

2022₱24.5M
Reported complete (DPWH)
No sat.

JCT TALUBIN-BARLIG-NATONIN-PARACELIS-CALACCAD RD - K0377+(-367) - K0377+(-281), K0380+300 - K380+390, K0385+455 - K0385+485, K0385+609 - K385+627

Mountain Province 1st DEO, Cordillera Administrative Region

2020₱22.7M
Reported complete (DPWH)
No sat.

CONSTRUCTION OF GUINZADAN NHS, BAUKO, MT. PROVINCE 2-STY, 6-CL SCHOOL BLDG.

Mountain Province 1st DEO, Cordillera Administrative Region

2016₱11.1M
Reported complete (DPWH)
No sat.

CY 2018 BEFF BATCH 1: PARACELIS NATIONAL HIGH SCHOOL, 2STY4CL, PARACELIS, MT PROVINCE

Mountain Province 2nd DEO, Cordillera Administrative Region

2018₱10.0M
Reported complete (DPWH)
No sat.

CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG AGKUYO-CHICO RIVER, FENGAR, STA. 33+070 -STA. 33+220(RS), PHASE 2, BONTOC, MOUNTAIN PROVINCE

Mountain Province 1st DEO, Cordillera Administrative Region

2025₱9.7M
Reported complete (DPWH)
View all 40 projects →

4. Implementation

Contract Amount

₱4,820,243.38

Progress

Reported complete (DPWH)

Start Date

June 26, 2018

Target End

September 23, 2018

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Cordillera Administrative Region (CAR)Mountain ProvinceBontocBontoc Ili
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
LandslideDetails in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.