Roads16JH0048

ROAD WIDENING ALONG BCR, LAMITAN-TIPOTIPO-TUMAHUBONG ROAD (TIPOTIPO PROPER SECTION) PHASE III, TIPOTIPO MUNICIPALITY, BASILAN PROVINCE

ROAD WIDENING ALONG BCR, LAMITAN-TIPOTIPO-TUMAHUBONG ROAD (TIPOTIPO PROPER SECTION) PHASE III, TIPOTIPO MUNICIPALITY, BASILAN PROVINCE is a DPWH-tracked public work in Isabela City DEO, Region IX. Reported contract value: ₱33,785,359.11. Status: Reported complete (DPWH). Contractor on record: ESR CONST AND DEVELOPMENT CORP FORMERLY: ESR CONST. Figures trace to dpwh.

Isabela City DEO, Region IX
Region: Region IX

Follow the peso

1 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2016 · ₱38,750 (shared by many projects, not this project's own line)

    Possible match · score 0.78

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-BMB-A-16-0003828 · · release to the district office, not itemized per project

    Possible match · score 0.67

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 16JH0048 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2015-05-10 → 2025-11-02

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: ROAD WIDENING ALONG BCR, LAMITAN-TIPOTIPO-TUMAHUBONG ROAD (TIPOTIPO PROPER SECTION) PHASE III, TIPOTIPO MUNICIPALITY, BASILAN PROVINCE

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 78%

UACS
18001
Amount
₱38,750,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Rehabilitation of Flood Control Structures along Cagayan River, Rang - ay, San Agustin, Isabela
GAA fiscal year
FY2016
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-BMB-A-16-0003828

₱-11,176,723,257.00 · FY2016

Released to Central Office (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

C

335 projects · ₱24.0B total · 0 flags

Other projects by this contractor

No sat.

CONSTRUCTION OF CONCRETE ROAD AND ROAD SLOPE PROTECTION STRUCTURE BALIGUIAN COASTAL ROAD, JUNCTION BALIGUIAN - KAUSWAGAN - MAMAD SECTION, ZAMBOANGA DEL NORTE, 2ND DEO, K2043+170.00 - K2044+410.00, K2044+810.00 - K2046+464.00, NET LENGTH: 5.79 LANE KM/2,8

Region IX, Region IX

2018₱280.6M
Reported complete (DPWH)
No sat.

CONCRETING OF ZAMBOANGA DEL SUR COASTAL ROAD, ZAMBOANGA DEL SUR (2ND DEO), CHAINAGE 0 - CHAINAGE 3008.75; CHAINAGE 6000 - CHAINAGE 7542.78; CHAINAGE 28510 - CHAINAGE 29558.80; CHAINAGE 97 - CHAINAGE 1097; CHAINAGE 940.00 - CHAINAGE 1979.62; CHAINAGE 21157

Region IX, Region IX

2016₱276.1M
Reported complete (DPWH)
No sat.

CONSTRUCTION OF BY-PASS AND DIVERSION ROADS LABANGAN - PAGADIAN CITY - DUMALINAO ZDS BY-PASS ROAD, INCLUDING ROW, ZAMBOANGA DEL SUR

Region IX, Region IX

2018₱215.6M
Reported complete (DPWH)
No sat.

CONCRETING OF ROAD LUUK - PANAMAO - PATIKUL CIRCUMFERENTIAL ROAD, SULU 2ND LD, STA. 5+000.00 - STA. 10+280.00 (NET LENGTH: 5,280.00 LN.M.)

Region IX, Region IX

2016₱202.5M
Reported complete (DPWH)
No sat.

ROAD WIDENING DIPOLOG - SINDANGAN - LILOY ROAD, ZAMBOANGA DEL NORTE 1ST DEO, K1873+862.00 - K1875+233.00, K1875+377.00 - K1877+534.00, K1881+560.00 - K1884+449.95, K1884+449.95 - K1885+210.00, NET LENGTH: 14.36 LANE KM/7,178.00 LN.M./7.178 KM

Region IX, Region IX

2018₱187.1M
Reported complete (DPWH)
No sat.

CONSTRUCTION OF ROAD ALONG NRJ BARANGAY CAMUL - NRJ BARANGAY LUMBAYAO PACKAGE 2, ZAMBOANGA DEL NORTE

Region IX, Region IX

2024₱173.6M
Past target date (DPWH On-Going)
View all 335 projects →

4. Implementation

Contract Amount

₱33,785,359.11

Progress

Reported complete (DPWH)

Start Date

February 15, 2016

Target End

June 25, 2016

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Bangsamoro Autonomous Region In Muslim Mindanao (BARMM)BasilanSumisipSapah Bulak
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.