Roads23PL0126

CONCRETING OF SITIO CALLAGDAO TO SITIO IPIL TO SITIO LACNOG, BRGY. BULANAO FMR., BRGY. BULANAO, TABUK CITY, KALINGA

CONCRETING OF SITIO CALLAGDAO TO SITIO IPIL TO SITIO LACNOG, BRGY. BULANAO FMR., BRGY. BULANAO, TABUK CITY, KALINGA is a DPWH-tracked public work in Lower Kalinga DEO, Cordillera Administrative Region. Reported contract value: ₱11,917,141.71. Status: Reported complete (DPWH). Contractor on record: BMJ BUILDERS. Figures trace to dpwh.

Lower Kalinga DEO, Cordillera Administrative Region
Region: Cordillera Administrative Region

Follow the peso

2 of 5 steps linked to this project. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2023 · ₱5,000

    Probable match · score 0.86

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 23PL0126 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2023-08-10 → 2023-08-10

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONCRETING OF SITIO CALLAGDAO TO SITIO IPIL TO SITIO LACNOG, BRGY. BULANAO FMR., BRGY. BULANAO, TABUK CITY, KALINGA

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 86%

UACS
18001
Amount
₱5,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of the Flood Control Structure at Brgy. Cabaruan, Tabuk City, Kalinga Province
GAA fiscal year
FY2023
DBM GAA source document

2. Allotment

Agency-level releases for FY2023, not tied to this contract

Lower Kalinga DEO · SARO 16 (₱22,616,681,592.00) · NCA 0 (₱0.00)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

C

49 projects · ₱553.3M total · 0 flags

Other projects by this contractor

No sat.

ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG CHICO RIVER AT DAMSITE

Lower Kalinga DEO, Cordillera Administrative Region

2025₱49.0M
Past target date (DPWH On-Going)
No sat.

LOCAL PROGRAM - NATIONAL BUILDING PROGRAM, BUILDINGS AND OTHER STRUCTURES - MULTIPURPOSE/FACILITIES, CONSTRUCTION OF DPWH MOUNTAIN PROVINCE 2ND DEO SUPPORT FACILITIES (COMPLETION), SALIOK, NATONIN, MOUNTAIN PROVINCE

Mountain Province 2nd DEO, Cordillera Administrative Region

2023₱29.4M
Reported complete (DPWH)
No sat.

CONSTRUCTION OF NGIPEN, BANTAY FLOOD CONTROL ALONG CHICO RIVER, BANTAY, TABUK CITY, KALINGA

Lower Kalinga DEO, Cordillera Administrative Region

2019₱28.9M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION - REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS - MT PROVINCE BDRY-CALANAN-PINUKPUK-ABBUT RD (CAGALUAN-CALAN

Lower Kalinga DEO, Cordillera Administrative Region

2024₱24.8M
Past target date (DPWH On-Going)
No sat.

LOCAL PROGRAM - NATIONAL BUILDING PROGRAM - BUILDINGS AND OTHER STRUCTURES - MULTIPURPOSE/FACILITIES - CONSTRUCTION OF DPWH UPPER KALINGA DISTRICT ENGINEERING OFFICE BUILDING, KALINGA

Upper Kalinga DEO, Cordillera Administrative Region

2021₱24.4M
Reported complete (DPWH)
No sat.

CONSTRUCTION OF LEVEL III WATER SUPPLY PROJECT, TANUDAN, KALINGA

Lower Kalinga DEO, Cordillera Administrative Region

2021₱24.4M
Reported complete (DPWH)
View all 49 projects →

4. Implementation

Contract Amount

₱11,917,141.71

Progress

Reported complete (DPWH)

Start Date

December 11, 2023

Target End

May 23, 2024

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Cordillera Administrative Region (CAR)KalingaCity of TabukBulanao
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.