Roads19FB0010

CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, CAMALIG BYPASS ROAD, ALBAY

CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, CAMALIG BYPASS ROAD, ALBAY is a DPWH-tracked public work in Albay 2nd DEO, Region V. Reported contract value: ₱47,186,572.07. Status: Reported complete (DPWH). Contractor on record: NUMERICAL GATE CONST. Figures trace to dpwh.

Albay 2nd DEO, Region V
Region: Region V

Follow the peso

2 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    No GAA line found for this project's office and year. The GAA lists budgets by program and office, not always by project.

  2. 2. SARO / NCA release

    NCA NCA-ROXI-19-0019722 · ₱241,576 · release to the district office, not itemized per project

    Possible match · score 0.70

    DBM release source ↗
  3. 3. PhilGEPS award

    ₱47,186,950 · NUMERICAL GATE CONSTRUCTION AND SUPPLY .

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · imagery 2019-02-14 → 2019-02-14

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, CAMALIG BYPASS ROAD, ALBAY

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

No matching GAA line found for this project in the FY2019 GAA. DBM GAA FY2019

2. Allotment

Office-level release, not tied to this specific contract

NCA NCA-ROXI-19-0019722

₱241,576.00 · FY2019

Released to Division of Davao del Norte (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM NCA listing (source)

3. Procurement & Award

Confirmed (exact contract ID) · 100%

Const. of By-Pass & Diversion Rds. Camalig Bypass

₱47,186,950.00 · NUMERICAL GATE CONSTRUCTION AND SUPPLY .

Award / contract ref: 19FB0010

Contractor

B

70 projects · ₱2.4B total · 0 flags

Other projects by this contractor

No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS-DARAGA URBAN TOURISM ECO ROUTE ROAD, ALBAY, DARAGA AND LEGAZPI CITY, ALBAY (2ND LEGISLATIVE DISTRICT)

Region V, Region V

2024₱168.9M
Past target date (DPWH On-Going)
No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF BY-PASS AND DIVERSION ROADS-DARAGA URBAN TOURISM ECO ROUTE ROAD, ALBAY, BRGY. BUSAY, BRGY. BINITAYAN, BRGY. PAWA, ALBAY (2ND LEGISLATIVE DI

Region V, Region V

2023₱124.6M
Past target date (DPWH On-Going)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO SEAPORTS - GUINOBATAN-JOVELLAR-DONSOL ROAD (ILULUAN - PARIAAN SECTION) LEADING TO PILAR PORT, CAMALIG, ALBAY

Albay 2nd DEO, Region V

2019₱96.5M
Reported complete (DPWH)
No sat.

CONSTRUCTION OF BY-PASS AND DIVERSION ROADS- CAMALIG BYPASS ROAD INCLUDING DRAINAGE SYSTEMS, ALBAY

Albay 2nd DEO, Region V

2023₱96.5M
Reported complete (DPWH)
No sat.

OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, DARAGA URBAN TOURISM ECO ROUTE (DUTERTE) PROJECT, ALBAY, DARAGA, ALBAY (2ND LEGISLATIVE DISTRICT)

Region V, Region V

2020₱86.5M
Reported complete (DPWH)
No sat.

CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION/REHABILITATION OF COTMON-HOYOP-HOYOPAN FLOOD CONTROL SYSTEM, BRGY. COTMON, CAMALIG, ALBAY

Albay 2nd DEO, Region V

2020₱74.8M
Reported complete (DPWH)
View all 70 projects →

4. Implementation

Contract Amount

₱47,186,572.07

Progress

Reported complete (DPWH)

Start Date

May 22, 2019

Target End

November 22, 2019

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region V (Bicol Region)AlbayCamaligQuirangay
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
Drought / dry spell likelyPAGASA · 2026-11-03El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.