Buildings and Facilities17BC0157

CONSTRUCTION OF 1 STOREY 2 CLASSROOM WITH CR AT CALAPANGAN ELEMENTARY SCHOOL STO NINO, CAGAYAN

CONSTRUCTION OF 1 STOREY 2 CLASSROOM WITH CR AT CALAPANGAN ELEMENTARY SCHOOL STO NINO, CAGAYAN is a DPWH-tracked public work in Cagayan 2nd DEO, Region II. Reported contract value: ₱2,656,259.88. Status: Reported complete (DPWH). Contractor on record: RPF CONST. Figures trace to dpwh.

Cagayan 2nd DEO, Region II
Region: Region II

Follow the peso

1 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2017 · ₱35,000 (shared by many projects, not this project's own line)

    Possible match · score 0.84

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-BMB-E-17-0025300 · ₱5,300,000 · release to the district office, not itemized per project

    Possible match · score 0.64

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 17BC0157 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2016-04-23 → 2025-09-23

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Unit-cost benchmark · School building, cost per classroom (new school building)

₱1,328,130 per classroom= 1.0x the Region II median (n=370)

Contract cost ₱2,656,260 ÷ 2 classroom read from the DPWH title (“2 CLASSROOM”; classroom count in title). National percentile: 26. Higher unit cost can have legitimate causes (terrain, design, scope not stated in the title); this is a comparison, not a finding. Methodology

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF 1 STOREY 2 CLASSROOM WITH CR AT CALAPANGAN ELEMENTARY SCHOOL STO NINO, CAGAYAN

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 84%

UACS
18001
Amount
₱35,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Project along Chico River, Piat, Cagayan
GAA fiscal year
FY2017
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-BMB-E-17-0025300

₱5,300,000.00 · FY2017

Released to Regional Office - Proper (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

C

56 projects · ₱1.1B total · 0 flags

Other projects by this contractor

No sat.

OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS; ALCALA-STO. NIÑO-LASAM ROAD, CAGAYAN, CAGAYAN-PACKAGE 2, CAGAYAN

Region II, Region II

2023₱113.3M
Past target date (DPWH On-Going)
No sat.

CSSP: SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ROAD LEADING TO CONVENTION/EXPO AND SPORTS CENTER, DIORA ZINUGAN, STA. ANA, CAGAYAN

Cagayan 1st DEO, Region II

2022₱96.5M
Reported complete (DPWH)
No sat.

NETWORK DEVELOPMENT-IMPROVEMENT/WIDENING OF NATIONAL ROADS - N1; ROAD WIDENING - JCT. LOGAC-MAGAPIT ROAD - K0708+580 - K0711+633.40 BARANGAY ALAGUIA TO BARANGAY MAGAPIT, LAL-LO, CAGAYAN (S00688LZ)

Cagayan 1st DEO, Region II

2017₱91.2M
Reported complete (DPWH)
No sat.

OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT PROGRAM: CONSTRUCTION OF BY-PASS AND DIVERSION ROADS- ALCALA-STO. NIÑO- LASAM ROAD

Region II, Region II

2022₱85.6M
Reported complete (DPWH)
No sat.

CONST./MAINTENANCE OF FLOOD MITIGATION STRUCTURE AND DRAINAGE SYSTEMS -CONST. OF FLOOD MITIGATION STRUCTURE- CONST. OF FLOOD CONTROL SYSTEM, STA. 0+000 - STA. 0+348 (DOWNSTREAM), BRGY. CASICALLAN NORTE & AGUIGUICAN, GATTARAN, CAGAYAN

Cagayan 1st DEO, Region II

2018₱66.9M
Reported complete (DPWH)
No sat.

Construction of Drainage System along Caritan- Balzain Creek Sta.0+(-280) - Sta. 0+(-689.20), Caritan, Tuguegarao City, Cagayan

TUGUEGARAO CITY (CAPITAL) (CAGAYAN), CAGAYAN, Region II

2022₱57.9M
Reported complete (DPWH)
View all 56 projects →

4. Implementation

Contract Amount

₱2,656,259.88

Progress

Reported complete (DPWH)

Start Date

December 27, 2017

Target End

May 5, 2018

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Cite this record

Love the Philippines. “CONSTRUCTION OF 1 STOREY 2 CLASSROOM WITH CR AT CALAPANGAN ELEMENTARY SCHOOL STO NINO, CAGAYAN.” Source: DPWH. Data as of October 21, 2026. https://lovethephilippines.com/projects/60668f53-fcba-4cba-be64-a2c3e4acce9a

The official source record is authoritative. An indicator on this site is not a finding of wrongdoing.

Connected records

Where this project sits

Place (PSGC)
Region II (Cagayan Valley)CagayanSanto Niño
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.