Bridges16B00068No coordinates published by DPWH

MFO 1: NAT'L ROAD NETWORK SERVICES: CONST'N & MAINTENANCE OF BRIDGES ALONG NAT'L RDS, WIDENING OF PERMANENT BRIDGES TO MORE THAN TWO LANES CARIG BRIDGE NO.1(B01912LZ), ALONG CAGAYAN VALLEY ROAD

MFO 1: NAT'L ROAD NETWORK SERVICES: CONST'N & MAINTENANCE OF BRIDGES ALONG NAT'L RDS, WIDENING OF PERMANENT BRIDGES TO MORE THAN TWO LANES CARIG BRIDGE NO.1(B01912LZ), ALONG CAGAYAN VALLEY ROAD is a DPWH-tracked public work in Region II, Region II. Reported contract value: ₱7,399,149.26. Status: Reported complete (DPWH). Contractor on record: RPF CONST. Figures trace to dpwh.

Region II, Region II

DPWH did not publish coordinates for this project, so it cannot be placed on the map or checked with satellite images.

Region: Region II

No before/after satellite images: DPWH has not published map coordinates for this project, so there is no location to image.

Follow the peso

1 of 5 steps linked to this project. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    No GAA line found for this project's office and year. The GAA lists budgets by program and office, not always by project.

  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 16B00068 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · no satellite pair yet

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: MFO 1: NAT'L ROAD NETWORK SERVICES: CONST'N & MAINTENANCE OF BRIDGES ALONG NAT'L RDS, WIDENING OF PERMANENT BRIDGES TO MORE THAN TWO LANES CARIG BRIDGE NO.1(B01912LZ), ALONG CAGAYAN VALLEY ROAD

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

No matching GAA line found for this project in the FY2016 GAA. DBM GAA FY2016

2. Allotment

No matching SARO/NCA release found for this project. Source: DBM SARO/NCA listings.

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

C

56 projects · ₱1.1B total · 0 flags

Other projects by this contractor

No sat.

OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS; ALCALA-STO. NIÑO-LASAM ROAD, CAGAYAN, CAGAYAN-PACKAGE 2, CAGAYAN

Region II, Region II

2023₱113.3M
Past target date (DPWH On-Going)
No sat.

CSSP: SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ROAD LEADING TO CONVENTION/EXPO AND SPORTS CENTER, DIORA ZINUGAN, STA. ANA, CAGAYAN

Cagayan 1st DEO, Region II

2022₱96.5M
Reported complete (DPWH)
No sat.

NETWORK DEVELOPMENT-IMPROVEMENT/WIDENING OF NATIONAL ROADS - N1; ROAD WIDENING - JCT. LOGAC-MAGAPIT ROAD - K0708+580 - K0711+633.40 BARANGAY ALAGUIA TO BARANGAY MAGAPIT, LAL-LO, CAGAYAN (S00688LZ)

Cagayan 1st DEO, Region II

2017₱91.2M
Reported complete (DPWH)
No sat.

OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT PROGRAM: CONSTRUCTION OF BY-PASS AND DIVERSION ROADS- ALCALA-STO. NIÑO- LASAM ROAD

Region II, Region II

2022₱85.6M
Reported complete (DPWH)
No sat.

CONST./MAINTENANCE OF FLOOD MITIGATION STRUCTURE AND DRAINAGE SYSTEMS -CONST. OF FLOOD MITIGATION STRUCTURE- CONST. OF FLOOD CONTROL SYSTEM, STA. 0+000 - STA. 0+348 (DOWNSTREAM), BRGY. CASICALLAN NORTE & AGUIGUICAN, GATTARAN, CAGAYAN

Cagayan 1st DEO, Region II

2018₱66.9M
Reported complete (DPWH)
No sat.

Construction of Drainage System along Caritan- Balzain Creek Sta.0+(-280) - Sta. 0+(-689.20), Caritan, Tuguegarao City, Cagayan

TUGUEGARAO CITY (CAPITAL) (CAGAYAN), CAGAYAN, Region II

2022₱57.9M
Reported complete (DPWH)
View all 56 projects →

4. Implementation

Contract Amount

₱7,399,149.26

Progress

Reported complete (DPWH)

Start Date

January 30, 2018

Target End

May 5, 2018

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Not yet linked to a PSGC area.
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No province on record.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.