Bridges19IC0012

REHAB./MAJOR REPAIR OF PERMANENT BRIDGES, SAN ISIDRO BRIDGE (B00485LT) ALONG TIGBAO-PULAK-STA. FE ROAD, STA. FE, LEYTE

REHAB./MAJOR REPAIR OF PERMANENT BRIDGES, SAN ISIDRO BRIDGE (B00485LT) ALONG TIGBAO-PULAK-STA. FE ROAD, STA. FE, LEYTE is a DPWH-tracked public work in Leyte 1st DEO, Region VIII. Reported contract value: ₱2,120,500.00. Status: Reported complete (DPWH). Contractor on record: ENLIVEN CONST AND ENT INC FORMERLY: ENLIVEN CONST AND ENT. Figures trace to dpwh.

Leyte 1st DEO, Region VIII
Region: Region VIII

Follow the peso

2 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    No GAA line found for this project's office and year. The GAA lists budgets by program and office, not always by project.

  2. 2. SARO / NCA release

    NCA NCA-ROV-19-0025892 · ₱56,648 · release to the district office, not itemized per project

    Possible match · score 0.68

    DBM release source ↗
  3. 3. PhilGEPS award

    ₱2,120,500

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · imagery 2019-04-20 → 2025-11-12

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: REHAB./MAJOR REPAIR OF PERMANENT BRIDGES, SAN ISIDRO BRIDGE (B00485LT) ALONG TIGBAO-PULAK-STA. FE ROAD, STA. FE, LEYTE

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

No matching GAA line found for this project in the FY2019 GAA. DBM GAA FY2019

2. Allotment

Office-level release, not tied to this specific contract

NCA NCA-ROV-19-0025892

₱56,648.00 · FY2019

Released to Donsol National Comprehensive High Scho (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM NCA listing (source)

3. Procurement & Award

Confirmed (exact contract ID) · 100%

CID No. 19IC0012

₱2,120,500.00 · Awardee from PhilGEPS

Award / contract ref: 19IC0012

Contractor

A

20 projects · ₱177.2M total · 0 flags

Other projects by this contractor

No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM -CONST./IMPROVEMENT OF VARIOUS INFRASTRUCTURE IN SUPPORT OF NATIONAL SECURITY - CONST. OF REGIONAL HEADQUARTERS ADMIN ANNEX BUILDING, CAMP KANGLEON, PALO, LEYTE

Leyte 1st DEO, Region VIII

2020₱27.5M
Reported complete (DPWH)
No sat.

CONST./IMPROVEMENT/UPGRADING OF VARIOUS DSWD BUILDINGS: 1. CONST. OF 2-STOREY RSCC BUILDING, LEFT WING (COMPLETE) AND COMPLETION OF 2ND FLOOR EXISTING MAIN ENTRANCE BUILDING, DSWD F08 CENTER AND INSTITUTION COMPLEX, PAWING, PALO, LEYTE - P10,621,755.00

Leyte 1st DEO, Region VIII

2017₱25.5M
Reported complete (DPWH)
No sat.

CONSTRUCTION (PHASE 1) OF FIELD OFFICE BUILDING - DEPARTMENT OF SOCIAL WELFARE AND DEVELOPMENT, PALO, LEYTE

Leyte 1st DEO, Region VIII

2022₱19.6M
Reported complete (DPWH)
No sat.

BUILDINGS AND OTHER STRUCTURES - MULTIPURPOSE/FACILITIES - LOCAL INFRASTRUCTURE REHAB./MAJOR REPAIR OF MULTI-PURPOSE BUILDING - IMPROVEMENT OF MULTI-PURPOSE BUILDING, SCHISTOSOMIASIS HOSPITAL, PALO, LEYTE

Leyte 1st DEO, Region VIII

2021₱16.8M
Reported complete (DPWH)
No sat.

CONSTRUCTION OF HOSPITAL BUILDING, SCHISTOSOMIASIS CONTROL AND RESEARCH INSTITUTE, PALO, LEYTE

Leyte 1st DEO, Region VIII

2020₱16.6M
Reported complete (DPWH)
No sat.

CLUSTER 6: 1.) & 2.) CONST. OF SINGLE STOREY SCIENCE LAB. BLDG. (7MX18M), BLDG. A - P 2,875,120.51 & BLDG. B - P 2,875,120.51 AND 3.) & 4.) CONST. OF SINGLE STOREY COMPUTER (ICT) LAB. BLDG. (7MX18M), BLDG. A - P 2,875,120.51 AND BLDG. B - P 2,875,120.51,

Leyte 1st DEO, Region VIII

2017₱11.4M
Reported complete (DPWH)
View all 20 projects →

4. Implementation

Contract Amount

₱2,120,500.00

Progress

Reported complete (DPWH)

Start Date

July 25, 2019

Target End

August 27, 2019

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region VIII (Eastern Visayas)LeyteSanta FeSan Isidro
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.