Flood Control and Drainage16KI0001

CY 2016 CONST. OF FLOOD CONTROL REVETMENT ALONG THE PROPOSE CORAZON AQUINO ROAD EXTENTION OROQUIETA CITY MISAMIS OCCIDENTAL

CY 2016 CONST. OF FLOOD CONTROL REVETMENT ALONG THE PROPOSE CORAZON AQUINO ROAD EXTENTION OROQUIETA CITY MISAMIS OCCIDENTAL is a DPWH-tracked public work in Misamis Occidental 1st DEO, Region X. Reported contract value: ₱4,790,929.35. Status: Reported complete (DPWH). Contractor on record: PHILIP CONST OF OROQUIETA CITY. Figures trace to dpwh.

Misamis Occidental 1st DEO, Region X
Region: Region X

Follow the peso

3 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2016 · ₱5,000

    Probable match · score 0.90

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-ROVIII-16-0001091 · ₱98,182 · release to the district office, not itemized per project

    Possible match · score 0.66

    DBM release source ↗
  3. 3. PhilGEPS award

    ₱4,790,929 · PHILIP CONSTRUCTION OF OROQUIETA CITY AND GENERAL MERCHANDISE

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · imagery 2015-07-14 → 2025-05-01

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Site vs flood hazard · Project NOAH 100-year map

Outside mapped flood-hazard zones · Misamis Occidental

Based on the coordinates published with the DPWH record and NOAH file MisamisOccidental.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CY 2016 CONST. OF FLOOD CONTROL REVETMENT ALONG THE PROPOSE CORAZON AQUINO ROAD EXTENTION OROQUIETA CITY MISAMIS OCCIDENTAL

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 90%

UACS
18001
Amount
₱5,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control - Revetment along the proposed Corazon Aquino Road Extension, Oroquieta, Misamis Occidental
GAA fiscal year
FY2016
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-ROVIII-16-0001091

₱98,182.00 · FY2016

Released to Eastern Samar National Comprehensive High SchTer (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

4. Implementation

Contract Amount

₱4,790,929.35

Progress

Reported complete (DPWH)

Start Date

March 30, 2016

Target End

August 26, 2016

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region X (Northern Mindanao)Misamis OccidentalCity of OroquietaLoboc Upper
Storms whose wind field reached it
Koto 2025
Hazard exposure
Storm surgeDetails in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.