Buildings and Facilities18FD0053

CONSTRUCTION OF A MULTI-PURPOSE BUILDING/ COVERED COURT AT BARANGAY PAG-ORING VIEJO, LIBMANAN, CAMARINE SUR

CONSTRUCTION OF A MULTI-PURPOSE BUILDING/ COVERED COURT AT BARANGAY PAG-ORING VIEJO, LIBMANAN, CAMARINE SUR is a DPWH-tracked public work in Camarines Sur 2nd DEO, Region V. Reported contract value: ₱2,896,832.27. Status: Reported complete (DPWH). Contractor on record: R K X ODIAMAR CONST. Figures trace to dpwh.

Camarines Sur 2nd DEO, Region V
Region: Region V

Follow the peso

2 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2018 · ₱40,000 (shared by many projects, not this project's own line)

    Possible match · score 0.84

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-ROV-18-0032622 · · release to the district office, not itemized per project

    Possible match · score 0.81

    DBM release source ↗
  3. 3. PhilGEPS award

    ₱2,896,832 · RKX ODIAMAR CONSTRUCTION

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · imagery 2012-06-23 → 2025-04-17

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF A MULTI-PURPOSE BUILDING/ COVERED COURT AT BARANGAY PAG-ORING VIEJO, LIBMANAN, CAMARINE SUR

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 84%

UACS
18001
Amount
₱40,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Dike within Bicol River Basin, Brgy. Bagumbayan, Libmanan, Camarines Sur
GAA fiscal year
FY2018
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-ROV-18-0032622

₱0.00 · FY2018

Released to Division of Camarines Sur (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

Confirmed (exact contract ID) · 100%

Const. of a MPB (Covered Court)

₱2,896,832.27 · RKX ODIAMAR CONSTRUCTION

Award / contract ref: 18FD0053

Contractor

B

83 projects · ₱3.3B total · 0 flags

Other projects by this contractor

No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM-BASIC INFRASTRUCTURE PROGRAM (BIP)-BIP-MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES-CONSTRUCTION OF MULTI-PURPOSE BUILDING, NEW CAPITOL COMPLEX, PILI, CAMARINES SUR, PILI, CAMARINES SUR (3RD LEGISLA

Region V, Region V

2024₱193.9M
Past target date (DPWH On-Going)
No sat.

OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF BY-PASS AND DIVERSION ROADS-CAMARINES SUR EXPRESSWAY PACKAGE 9, CAMARINES SUR, MINALABAC, CAMARINES SUR (2ND LEGISLATIVE DISTRICT)

Region V, Region V

2023₱165.7M
Past target date (DPWH On-Going)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM-CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS-PASACAO-BALATAN TOURISM COASTAL HIGHWAY LEADING TO PASACAO PORT TO WHITE SAND BEACHES, BRGY. ODICON, PASACAO, CAMARINES SUR

Region V, Region V

2018₱144.7M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES-CONSTRUCTION OF MULTI-PURPOSE BUILDING, CAPITOL COMPLEX, BARANGAY CADLAN, PILI, CAMARINES SU

Region V, Region V

2023₱141.1M
Past target date (DPWH On-Going)
No sat.

CLUSTER XLIII-CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP)-BASIC INFRASTRUCTURE PROGRAM (BIP)-MULTI-PURPOSE BUILDINGS_FACILITIES TO SUPPORT SOCIAL SERVICES- 1.) CONST. OF MULTI-PURPOSE BUILDING (BALAY NA DAKU), BRGY. SOMALOT, CASIGURAN 2.) CONST. OF MU

Sorsogon DEO, Region V

2022₱99.0M
Reported complete (DPWH)
No sat.

LOCAL PROGRAM-CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS-LOCAL ROADS AND BRIDGES-LOCAL ROADS-CONSTRUCTION OF PASACAO-BALATAN COASTAL ROAD, BRGY. ODICON, PASACAO, CAMARINES SUR, PASACAO, CAMARINES SUR

Region V, Region V

2020₱96.5M
Reported complete (DPWH)
View all 83 projects →

4. Implementation

Contract Amount

₱2,896,832.27

Progress

Reported complete (DPWH)

Start Date

May 7, 2018

Target End

September 23, 2018

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Cite this record

Love the Philippines. “CONSTRUCTION OF A MULTI-PURPOSE BUILDING/ COVERED COURT AT BARANGAY PAG-ORING VIEJO, LIBMANAN, CAMARINE SUR.” Source: DPWH. Data as of October 21, 2026. https://lovethephilippines.com/projects/68548ed2-f918-426e-b26b-21117335aaee

The official source record is authoritative. An indicator on this site is not a finding of wrongdoing.

Connected records

Where this project sits

Place (PSGC)
Region V (Bicol Region)Camarines SurLibmananSan Isidro
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.