Flood Control and Drainage17FA0005No coordinates published by DPWH

CONSTRUCTION/REHABILITATION OF SITIO SAN ANTONIO RIVER CONTROL ALONG BASUD RIVER, SAN ANTONIO, STO. DOMINGO, ALBAY 1ST LD

CONSTRUCTION/REHABILITATION OF SITIO SAN ANTONIO RIVER CONTROL ALONG BASUD RIVER, SAN ANTONIO, STO. DOMINGO, ALBAY 1ST LD is a DPWH-tracked public work in Albay 1st DEO, Region V. Reported contract value: ₱41,829,472.38. Status: Reported complete (DPWH). Contractor on record: ALNINO CONST. Figures trace to dpwh.

Albay 1st DEO, Region V

DPWH did not publish coordinates for this project. Location estimated from the project title (town level only); satellite images may not show the exact site.

Region: Region V

No before/after satellite images: DPWH did not publish coordinates, and the location estimated from the project title is only town level, which is not confident enough to image.

Follow the peso

2 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2017 · ₱45,000 (shared by many projects, not this project's own line)

    Possible match · score 0.83

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-ROV-17-0008992 · ₱35,000 · release to the district office, not itemized per project

    Possible match · score 0.66

    DBM release source ↗
  3. 3. PhilGEPS award

    ₱41,829,472 · AL NIÑO CONSTRUCTION & SUPPLY

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · no satellite pair yet

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION/REHABILITATION OF SITIO SAN ANTONIO RIVER CONTROL ALONG BASUD RIVER, SAN ANTONIO, STO. DOMINGO, ALBAY 1ST LD

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 83%

UACS
18001
Amount
₱45,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction/Rehabilitation of Barangay Nagas Flood Control (Upstream) along Nagas/Taki River, Nagas, Tiwi, Albay
GAA fiscal year
FY2017
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-ROV-17-0008992

₱35,000.00 · FY2017

Released to Tabaco National High School (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

Confirmed (exact contract ID) · 100%

Contract ID No. 17FA0005

₱41,829,472.38 · AL NIÑO CONSTRUCTION & SUPPLY

Award / contract ref: 17FA0005

Contractor

B

123 projects · ₱5.4B total · 0 flags

Other projects by this contractor

No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM-CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM-TRIP)PASACAO-BALATAN TOURISM COASTAL HIGHWAY, PASACAO, CAMARINES SUR, CAMARINES SUR (2ND LEGISLA

Region V, Region V

2023₱125.4M
Reported complete (DPWH)
No sat.

OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT-ROAD WIDENING-PRIMARY ROADS-DAANG MAHARLIKA (LZ)-K0399+243-K0400+614.45, LIBMANAN, CAMARINES SUR (2ND LEGISLATIVE DISTRICT)

Region V, Region V

2022₱119.4M
Reported complete (DPWH)
No sat.

OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - LA MEDALLA-SALVACION-SAN VICENTE DIVERSION ROAD, CAMARINES SUR

Camarines Sur 5th DEO, Region V

2024₱106.3M
Reported complete (DPWH)
No sat.

NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF BY PASS AND DIVERSION ROADS-CASTILLA BY PASS ROAD PACKAGE 3 CASTILLA, SORSOGON

Sorsogon DEO, Region V

2021₱104.0M
Reported complete (DPWH)
No sat.

CONST/IMPRVT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS(TOURISM RD INFRA. PROGRAM-TRIP

Sorsogon 2nd DEO, Region V

2023₱96.5M
Reported complete (DPWH)
No sat.

LOCAL PROGRAM-CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS-LOCAL ROADS AND BRIDGES-LOCAL ROADS-CONSTRUCTION OF PASACAO-BALATAN COASTAL ROAD, BRGY. PINAMASAGAN, SAN FERNANDO, CAMARINES SUR, SAN FERNANDO,

Region V, Region V

2020₱96.5M
Reported complete (DPWH)
View all 123 projects →

4. Implementation

Contract Amount

₱41,829,472.38

Progress

Reported complete (DPWH)

Start Date

February 26, 2017

Target End

July 18, 2017

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region V (Bicol Region)AlbaySanto Domingo
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
Drought / dry spell likelyPAGASA · 2026-11-03El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.