Buildings and Facilities23AB0153

CONSTRUCTION OF MULTI-PURPOSE BUILDING, CURRIMAO TABACALERA, CURRIMAO, ILOCOS NORTE

CONSTRUCTION OF MULTI-PURPOSE BUILDING, CURRIMAO TABACALERA, CURRIMAO, ILOCOS NORTE is a DPWH-tracked public work in Ilocos Norte 2nd DEO, Region I. Reported contract value: ₱95,972,119.73. Status: Past target date (DPWH On-Going). Contractor on record: AJ TAYLAN CONST CORP. Figures trace to dpwh.

Ilocos Norte 2nd DEO, Region I
Region: Region I

Follow the peso

2 of 5 steps linked to this project. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2023 · ₱20,000

    Probable match · score 0.86

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 23AB0153 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    22% reported · imagery 2023-02-02 → 2025-09-29

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF MULTI-PURPOSE BUILDING, CURRIMAO TABACALERA, CURRIMAO, ILOCOS NORTE

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 86%

UACS
18001
Amount
₱20,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Rehabilitation of Flood Control Structure along Poblacion River, Currimao, Ilocos Norte
GAA fiscal year
FY2023
DBM GAA source document

2. Allotment

Agency-level releases for FY2023, not tied to this contract

Ilocos Norte 2nd DEO · SARO 16 (₱22,616,681,592.00) · NCA 0 (₱0.00)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

C

48 projects · ₱1.3B total · 0 flags

Other projects by this contractor

No sat.

ROAD UPGRADING (UNPAVED TO PAVED) BASED ON GRAVEL ROAD STRATEGIES, TRAFFIC BENCHMARK FOR UPGRADING TO PAVED ROAD STANDARDS (HDM-4 PROJECT ANALYSIS) ALONG BATAC- PINILI VIA MAIPALIG ROAD,S04765LZ,K0485+624-K0485+978;K0486+023-K0486+304;K0486+369-K0488+039;

Region I, Region I

2016₱83.7M
Reported complete (DPWH)
No sat.

SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - MULTI PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION (COMPLETION) OF FERDINAND E. MARCOS MEMORIAL STADIUM, LAOAG CITY, ILOCOS NORTE

Ilocos Norte 1st DEO, Region I

2023₱67.5M
Reported complete (DPWH)
No sat.

REHABILITATION OF CURRIMAO SEAWALL FROM BARANGAY POBLACION 1 TO BARANGAY TORRE AND SALUGAN, CURRIMAO, ILOCOS NORTE

Ilocos Norte 2nd DEO, Region I

2019₱49.5M
Reported complete (DPWH)
No sat.

CONSTRUCTION/ MAINTENANCE OF FLOOD CONTROL MITIGATION STURCTURES & DRAINAGE SYSTEMS - REHABILITATION OF DAMAGED BANK PROTECTION AND CONSTRUCTION OF DIKE EXTENSION ALONG BONGO RIVER, BRGY. MEDINA, DINGRAS, ILOCOS NORTE

Ilocos Norte 2nd DEO, Region I

2019₱49.0M
Reported complete (DPWH)
No sat.

CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM - REHABILITATION OF ERODED PROTECTION ALONG BONGO RIVER AT BRGY. GUERRERO, DINGRAS, ILOCOS NORTE

Ilocos Norte 2nd DEO, Region I

2019₱49.0M
Reported complete (DPWH)
No sat.

CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION/MAINTENANCE OF FLOOD CONTROL STRUCTURE ALONG BONGO RIVER BARANGAY PERALTA, DINGRAS, ILOCOS NORTE

Region I, Region I

2023₱48.2M
Past target date (DPWH On-Going)
View all 48 projects →

4. Implementation

Contract Amount

₱95,972,119.73

Progress

Past target date (DPWH On-Going)

Start Date

December 19, 2023

Target End

December 22, 2024

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region I (Ilocos Region)Ilocos NorteCurrimaoPoblacion I
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
Storm surgeDetails in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.