Roads19GE0075

ROAD WIDENING-ALONG GUIMARAS CIRCUMFERENTIAL RD (S00028GR) K0011+860 - K0012+800

ROAD WIDENING-ALONG GUIMARAS CIRCUMFERENTIAL RD (S00028GR) K0011+860 - K0012+800 is a DPWH-tracked public work in Guimaras DEO, Region VI. Reported contract value: ₱38,878,027.81. Status: Reported complete (DPWH). Contractor on record: S T SALCEDO CONST CORP FORMERLY: SHAK CONST. Figures trace to dpwh.

Guimaras DEO, Region VI
Region: Region VI

Follow the peso

1 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    No GAA line found for this project's office and year. The GAA lists budgets by program and office, not always by project.

  2. 2. SARO / NCA release

    SARO SARO-ROVIII-19-0025082 · ₱71,211 · release to the district office, not itemized per project

    Possible match · score 0.64

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 19GE0075 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2018-02-09 → 2022-11-29

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Unit-cost benchmark · Road, cost per km (widening)

₱41,359,604 per km= 1.4x the Region VI median (n=261)

Contract cost ₱38,878,028 ÷ 0.94 km read from the DPWH title (“K0011+860 - K0012+800”; K-post / station range length). National percentile: 70. Higher unit cost can have legitimate causes (terrain, design, scope not stated in the title); this is a comparison, not a finding. Methodology

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: ROAD WIDENING-ALONG GUIMARAS CIRCUMFERENTIAL RD (S00028GR) K0011+860 - K0012+800

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

No matching GAA line found for this project in the FY2019 GAA. DBM GAA FY2019

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-ROVIII-19-0025082

₱71,211.00 · FY2019

Released to Biliran District Engineerin Office (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

4. Implementation

Contract Amount

₱38,878,027.81

Progress

Reported complete (DPWH)

Start Date

June 28, 2019

Target End

November 26, 2019

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region VI (Western Visayas)GuimarasBuenavistaPiña
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
Dry conditions likelyPAGASA · 2026-10-07El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.