Construction of Slope Protection Structure22BC0152

Construction of Embankment Protection (Gabion) at Salongsong Creek, Barangay Salongsong, Sta. Praxedes, Cagayan

Construction of Embankment Protection (Gabion) at Salongsong Creek, Barangay Salongsong, Sta. Praxedes, Cagayan is a DPWH-tracked public work in SANTA PRAXEDES (CAGAYAN), CAGAYAN, Region II. Reported contract value: ₱11,880,000.00. Status: Reported complete (DPWH). Contractor on record: JEICCA BUILDERS. Figures trace to sumbong.

SANTA PRAXEDES (CAGAYAN), CAGAYAN, Region II
Region: Region II

Follow the peso

2 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2022 · ₱20,000

    Probable match · score 0.88

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-BMB-A-22-0002960 · ₱846,283,000

    Possible match · score 0.60

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 22BC0152 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2020-03-26 → 2025-05-14

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: Construction of Embankment Protection (Gabion) at Salongsong Creek, Barangay Salongsong, Sta. Praxedes, Cagayan

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 88%

UACS
18001
Amount
₱20,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Structure along Langgangan River, Sanjera San Pablo of Brgy. Capacuan, Sta. Praxedes, Cagayan
GAA fiscal year
FY2022
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-BMB-A-22-0002960

₱846,283,000.00 · FY2022

DBM SARO listing (source)

Office-level release, not tied to this specific contract

SARO SARO-ROII-22-0004119

₱1,747,026.00 · FY2022

DBM SARO listing (source)

Office-level release, not tied to this specific contract

SARO SARO-ROII-22-0004120

₱160,190.00 · FY2022

DBM SARO listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

C

60 projects · ₱1.2B total · 7 flags

Other projects by this contractor

No sat.

ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF SANTO TOMAS FLOOD CONTROL

Cagayan 2nd DEO, Region II

2025₱95.5M
Past target date (DPWH On-Going)
No sat.

ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF CABICUNGAN FLOOD CONTROL STRUC

Cagayan 2nd DEO, Region II

2025₱72.3M
Past target date (DPWH On-Going)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM-BASIC INFRASTRUCTURE PROGRAM (BIP)-MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES-CONSTRUCTION OF MULTI-PURPOSE BUILDING, GUIDDAM, ABULUG, CAGAYAN

Cagayan 2nd DEO, Region II

2024₱49.5M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM-BASIC INFRASTRUCTURE PROGRAM (BIP)- MULTI PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY GUIDDAM, ABULUG, CAGAYAN

Cagayan 2nd DEO, Region II

2025₱49.4M
Past target date (DPWH On-Going)
No sat.

Construction of Seawall along Shoreline of Ballesteros, Cagayan (Package 1)

BALLESTEROS (CAGAYAN), CAGAYAN, Region II

2024₱48.4M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS: CONSTRUCTION OF SEAWALL ALONG THE SHORELINE OF BALLESTEROS, PACKAGE 13,

Cagayan 2nd DEO, Region II

2024₱48.3M
Reported complete (DPWH)
View all 60 projects →

4. Implementation

Contract Amount

₱11,880,000.00

Progress

Reported complete (DPWH)

Start Date

March 25, 2022

Target End

September 2, 2022

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region II (Cagayan Valley)CagayanSanta PraxedesSalungsong
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.