REHABILITATION OF FLOOD CONTROL ALONG SAYRE HIGHWAY WITH SLOPE PROTECTION, ALAE-KISOLON SECTION (K1459+378-K1459+628), MALUKO, MANOLO FORTICH, BUKIDNON
REHABILITATION OF FLOOD CONTROL ALONG SAYRE HIGHWAY WITH SLOPE PROTECTION, ALAE-KISOLON SECTION (K1459+378-K1459+628), MALUKO, MANOLO FORTICH, BUKIDNON is a DPWH-tracked public work in Bukidnon 3rd DEO, Region X. Reported contract value: ₱16,095,520.00. Status: Reported complete (DPWH). Contractor on record: C'ZARLES CONST. Figures trace to dpwh.
DPWH did not publish coordinates for this project. Location estimated from the project title (barangay level); satellite images may not show the exact site.
Total Contract Cost