GAA 2017 MFO-117M00014

ROAD UPGRADING (UNPAVED TO PAVED) OF ISULAN JCT. NINOY AQUINO ROAD, K1833+775-K1835+277 (CHAINAGE 50336-CHAINAGE 51875); K1836+538-K1837+000 (CHAINAGE 53147-CHAINAGE 53678); K1837+739-K1838+263 (CHAINAGE 54417-CHAINAGE 55013); K1838+710-K1839+060 (CHAINAG

ROAD UPGRADING (UNPAVED TO PAVED) OF ISULAN JCT. NINOY AQUINO ROAD, K1833+775-K1835+277 (CHAINAGE 50336-CHAINAGE 51875); K1836+538-K1837+000 (CHAINAGE 53147-CHAINAGE 53678); K1837+739-K1838+263 (CHAINAGE 54417-CHAINAGE 55013); K1838+710-K1839+060 (CHAINAG is a DPWH-tracked public work in Region XII, Region XII. Reported contract value: ₱138,540,243.61. Status: Reported complete (DPWH). Contractor on record: NFH CONST & SUPPLY. Figures trace to dpwh.

Region XII, Region XII
Region: Region XII

Follow the peso

1 of 5 steps linked to this project. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    No GAA line found for this project's office and year. The GAA lists budgets by program and office, not always by project.

  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 17M00014 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2016-02-19 → 2025-07-30

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Unit-cost benchmark · Road, cost per km (new paving / upgrading)

₱48,816,153 per km= 1.6x the Region XII median (n=242)

Contract cost ₱138,540,244 ÷ 2.838 km read from the DPWH title (“K1833+775-K1835+277; K1836+538-K1837+000; K1837+739-K1838+263; K1838+710-K1839+060”; K-post / station range length). National percentile: 86. Higher unit cost can have legitimate causes (terrain, design, scope not stated in the title); this is a comparison, not a finding. Methodology

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: ROAD UPGRADING (UNPAVED TO PAVED) OF ISULAN JCT. NINOY AQUINO ROAD, K1833+775-K1835+277 (CHAINAGE 50336-CHAINAGE 51875); K1836+538-K1837+000 (CHAINAGE 53147-CHAINAGE 53678); K1837+739-K1838+263 (CHAINAGE 54417-CHAINAGE 55013); K1838+710-K1839+060 (CHAINAG

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

No matching GAA line found for this project in the FY2017 GAA. DBM GAA FY2017

2. Allotment

No matching SARO/NCA release found for this project. Source: DBM SARO/NCA listings.

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

50 projects · ₱4.0B total · 5 flags

Other projects by this contractor

No sat.

ASSET PRESERVATION - PREVENTIVE MAINTENANCE - PRIMARY ROADS - DAANG MAHARLIKA (SM) (SN ISIDRO - SN JUANICO BR.) - K0681+580 - K0683+000, K0683+410 - K0684+440, K0684+750 - K0685+810, K0687+964 - K0688+092

Region VIII, Region VIII

2024₱250.2M
Past target date (DPWH On-Going)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM-CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO SEAPORTS (KALSADA TUNGO SA PALIPARAN, RILES AT DAUNGAN PROGRAM-KATUPARAN)-IMELDA BOULEVARD, VIRAC, CATANDUANES, VIRAC, CATANDUANES (LONE DISTRICT)

Region V, Region V

2024₱232.6M
Past target date (DPWH On-Going)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SPECIAL ROAD FUND-MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239-PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY ALONG DAANG MAHARLIKA (LZ)-K0456+(-892)-K0456+(-627), K0457+1741-K0457+2047, K0461+385-K0463+000

Region V, Region V

2024₱222.3M
Reported complete (100% progress, DPWH status On-Going)
No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF BY-PASS AND DIVERSION ROADS-CAMARINES SUR EXPRESSWAY PACKAGE 19, CAMARINES SUR, PILI, CAMARINES SUR (3RD LEGISLATIVE DISTRICT)

Region V, Region V

2024₱193.0M
Past target date (DPWH On-Going)
No sat.

MFO3-MAINTENANCE & CONSTRUCTION SERVICES OF OTHER INFRASTRUCTURES: CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS, DARAGA, PLACER-DIVISORIA, CAWAYAN ROAD, MASBATE PROVINCE

Region V, Region V

2017₱193.0M
Reported complete (DPWH)
No sat.

BRIDGE - WIDENING OF PERMANENT BRIDGES - PALANIT BR. (B00237SM) ALONG DAANG MAHARLIKA (SM) (SN ISIDRO - SN JUANICO BR.), NORTHERN SAMAR 1

Region VIII, Region VIII

2024₱192.9M
Past target date (DPWH On-Going)
View all 50 projects →

4. Implementation

Contract Amount

₱138,540,243.61

Progress

Reported complete (DPWH)

Start Date

April 21, 2017

Target End

April 15, 2018

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region XII (SOCCSKSARGEN)Sultan KudaratSen. Ninoy AquinoGapok
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
LandslideDetails in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.