Roads19FN0055

ROAD WIDENING - TERTIARY ROADS, SIPOCOT-CABUSAO ROAD (S03516LZ) K0404+682 - K0406+712

ROAD WIDENING - TERTIARY ROADS, SIPOCOT-CABUSAO ROAD (S03516LZ) K0404+682 - K0406+712 is a DPWH-tracked public work in Camarines Sur 1st DEO, Region V. Reported contract value: ₱58,457,463.66. Status: Reported complete (DPWH). Contractor on record: PARTIDO CONST. Figures trace to dpwh.

Camarines Sur 1st DEO, Region V
Region: Region V

Follow the peso

1 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    No GAA line found for this project's office and year. The GAA lists budgets by program and office, not always by project.

  2. 2. SARO / NCA release

    SARO SARO-ROV-19-0018815 · · release to the district office, not itemized per project

    Possible match · score 0.78

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 19FN0055 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2017-03-31 → 2021-03-07

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Unit-cost benchmark · Road, cost per km (widening)

₱28,796,780 per km= 0.7x the Region V median (n=215)

Contract cost ₱58,457,464 ÷ 2.03 km read from the DPWH title (“K0404+682 - K0406+712”; K-post / station range length). National percentile: 32. Higher unit cost can have legitimate causes (terrain, design, scope not stated in the title); this is a comparison, not a finding. Methodology

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: ROAD WIDENING - TERTIARY ROADS, SIPOCOT-CABUSAO ROAD (S03516LZ) K0404+682 - K0406+712

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

No matching GAA line found for this project in the FY2019 GAA. DBM GAA FY2019

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-ROV-19-0018815

₱0.00 · FY2019

Released to Division of Camarines Norte (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

134 projects · ₱5.3B total · 0 flags

Other projects by this contractor

CONVERGENCE AND SPECIAL SUPPORT PROGRAM-BASIC INFRASTRUCTURE PROGRAM (BIP)-BIP-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, BARANGAY GUINACUTAN, VINZONS, CAMARINES NORTE, VI

Region V, Region V

2024₱198.0M
Reported complete (DPWH)
No sat.

OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM-ROAD WIDENING PRIMARY ROADS, DAANG MAHARLIKA, K0251+800.00-K0251+887.00; K0251+1048-K0252+700.00; K0252+750.00-K0254+040.00, CAMARINES NORTE

Region V, Region V

2019₱115.8M
Reported complete (DPWH)
No sat.

CONSTRUCTION OF MISSING LINK/NEW ROAD,LALUD - GARCHITORENA ROAD STA.5+713.73 - STA.10+809.63 LAGONOY, CAMARINES SUR

Camarines Sur 4th DEO, Region V

2020₱106.1M
Reported complete (DPWH)
No sat.

CONSTRUCTION OF MISSING LINK/NEW ROAD,(P00402351LZ)LAGONOY-CARAMOAN ROAD SECTION 1: STA.4+390.90 - STA.6+327.41 SECTION 2: STA.7+640.90 - STA.8+204.39 LAGONOY SECTION, CAMARINES SUR

Camarines Sur 4th DEO, Region V

2020₱100.8M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT PROGRAM-ROAD WIDENING-PRIMARY ROADS-MAHARLIKA HIGHWAY-K0277+000-K0278+956, K0278+994-K0279+225, LABO, CAMARINES NORTE (1ST LEGISLATIVE DISTRICT)

Region V, Region V

2025₱100.2M
Past target date (DPWH On-Going)
No sat.

REHAB./RECONST./UPGRADING OF DAMAGED PAVED ROADS ALONG TIGAON-GOA-SAN JOSE-LAGONOY-GUIJALO VIA SAN VICENTE ROAD K0573+089.00 - K0575+000.00; K0575+233.00 - K0575+522.00; K0575+522.00 - K0575+824.00; K0575+895.00 - K0576+1120.00 CARAMOAN, CAMARINES SUR

Camarines Sur 4th DEO, Region V

2024₱96.5M
Reported complete (DPWH)
View all 134 projects →

4. Implementation

Contract Amount

₱58,457,463.66

Progress

Reported complete (DPWH)

Start Date

July 4, 2019

Target End

February 4, 2020

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region V (Bicol Region)Camarines SurCabusaoPandan
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
Storm surgeDetails in Hazard context above.Full hazard check →
El Niño outlook (province)
Drought / dry spell likelyPAGASA · 2026-10-07El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.